共 50 条
- [3] EFFECT OF DISCONTINUITIES ON A ROOM-AND-PILLAR COAL-MINE PLAN AAPG BULLETIN-AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS, 1982, 66 (08): : 1172 - 1173
- [5] Pillar drawing in room-and-pillar mining at Jinshan Gold Mine 2003, Mining Research and Development (23):
- [6] Application of discrete event simulation in optimising coal mine room-and-pillar panel width: a case study Anani, Angelina (akakc2@mst.edu), 1600, Taylor and Francis Ltd. (126): : 1 - 9
- [8] Technology improvements aid room-and-pillar coal mining Bise, Christopher J., 1600, Soc for Mining, Metallurgy & Exploration Inc, Littleton, CO, United States (47):
- [9] Long-term stability of a backfilled room-and-pillar mine FIELD MEASUREMENTS OF GEOMECHANICS, 1999, : 431 - 435