Optimal production policy for a closed-loop supply chain with stochastic lead time and learning in production

被引:4
作者
Giri, B. C. [1 ]
Masanta, M. [1 ]
机构
[1] Jadaepur Univ, Dept Math, Kolkata 700082, India
关键词
Closed-loop supply chain; Stochastic lead time; Learning; Remanufacturing; INVENTORY MODEL; BUYER MODEL; VENDOR; QUALITY; DEMAND; SYSTEM; CURVE; RETURNS; QUANTITY;
D O I
10.24200/sci.2019.21537
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a closed-loop supply chain with one manufacturer and one retailer for trading a single product. On behalf of the manufacturer, the retailer collects the used items from the end customers for possible remanufacturing. The production of finished products (manufactured and remanufactured) is subject to learning. The lead time for the retailer is assumed to be stochastic. The manufacturer delivers the retailer's order quantity in a number of equal-sized shipments. The objective is to determine the optimal number of shipments and shipment size by minimizing the average expected total cost of the closed-loop supply chain. A solution method for the model is presented, and important results are obtained for numerical examples. According to the numerical study, an impressive cost reduction due to consideration of learning in production and remanufacturing is observed. To investigate the impact of key model parameters on the optimal results, a sensitivity analysis is also carried out. The proposed model is applicable to those business firms whose production process is executed by the human beings. (C) 2019 Sharif University of Technology. All rights reserved.
引用
收藏
页码:2936 / 2951
页数:16
相关论文
共 56 条
[1]   Analysis of the Lead Time Distribution in Closed Loop Manufacturing Systems [J].
Angius, Alessio ;
Colledani, Marcello ;
Horvath, Andras ;
Gershwin, StanleyB. .
IFAC PAPERSONLINE, 2016, 49 (12) :307-312
[2]   Integrated single vendor single buyer model with stochastic demand and variable lead time [J].
Ben-Daya, M ;
Hariga, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 92 (01) :75-80
[3]  
BENDAYA M, 1994, J OPER RES SOC, V45, P579, DOI 10.1038/sj/jors/0450510
[4]   Learning curve theory and innovation [J].
Burr, William ;
Pearne, Nick .
CIRCUIT WORLD, 2013, 39 (04) :169-173
[5]  
CARLSON JG, 1976, IND ENG, V8, P40
[6]  
Charter Martin, 2008, International Journal of Product Development, V6, P375, DOI 10.1504/IJPD.2008.020406
[7]  
Ching-Jong Liao, 1991, International Journal of Operations & Production Management, V11, P72, DOI 10.1108/EUM0000000001287
[8]  
Chiu HN, 2003, PROD OPER MANAG, V12, P120, DOI 10.1111/j.1937-5956.2003.tb00201.x
[9]   Optimal policy for a closed-loop supply chain inventory system with remanufacturing [J].
Chung, Shen-Lian ;
Wee, Hui-Ming ;
Yang, Po-Chung .
MATHEMATICAL AND COMPUTER MODELLING, 2008, 48 (5-6) :867-881
[10]   OPTIMAL POLICIES FOR A MULTI-ECHELON INVENTORY PROBLEM [J].
CLARK, AJ ;
SCARF, H .
MANAGEMENT SCIENCE, 1960, 6 (04) :475-490