Constraint Programming for New Product Development Project Prototyping

被引:2
作者
Relich, Marcin [1 ]
Nielsen, Izabela [2 ]
Bocewicz, Grzegorz [3 ]
Banaszak, Zbigniew [3 ]
机构
[1] Univ Zielona Gora, Fac Econ & Management, Zielona Gora, Poland
[2] Aalborg Univ, Dept Mat & Prod, Aalborg, Denmark
[3] Koszalin Univ Technol, Fac Elect & Comp Sci, Koszalin, Poland
来源
INTELLIGENT INFORMATION AND DATABASE SYSTEMS (ACIIDS 2020), PT II | 2020年 / 12034卷
关键词
Project evaluation; Product development cost; Neuro-fuzzy system; Decision support system; Constraint satisfaction problem; ARTIFICIAL NEURAL-NETWORKS; DECISION-SUPPORT; MODELS;
D O I
10.1007/978-3-030-42058-1_3
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The paper is concerned with using computational intelligence for identifying the relationships between variables and constraint programming for searching variants of completing a new product development project. The relationships are used to the cost estimation of newproduct development (NPD) and to the search for possible variants of reaching the desirable NPD cost. The main contribution of this paper is the use of constraint programming to a project prototyping problem in the context of product development. Moreover, the paper presents a method for estimating the NPD cost and searching variants that can ensure the desirable NPD cost. The project prototyping problem is formulated in terms of a constraint satisfaction problem and implemented using constraint programming techniques. These techniques enable declarative description of the considered problem and effective search strategies for finding admissible solutions. An example illustrates the applicability of the proposed approach for solving an NPD project prototyping problem.
引用
收藏
页码:26 / 37
页数:12
相关论文
共 21 条
[1]  
Apt K., 2003, Principles of constraint programming
[2]   Constraint programming for project-driven manufacturing [J].
Banaszak, Z. A. ;
Zaremba, M. B. ;
Muszynski, W. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :463-475
[3]  
Banaszak ZA, 2006, INT SER OPER RES MAN, V92, P409, DOI 10.1007/978-0-387-33768-5_16
[4]  
Baptiste P., 2001, Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems
[5]   Production flows scheduling subject to fuzzy processing time constraints [J].
Bocewicz, Grzegorz ;
Nielsen, Izabela Ewa ;
Banaszak, Zbigniew Antoni .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2016, 29 (10) :1105-1127
[6]   Planning as constraint satisfaction: Solving the planning graph by compiling it into CSP [J].
Do, MB ;
Kambhampati, S .
ARTIFICIAL INTELLIGENCE, 2001, 132 (02) :151-182
[7]   A decision support system for demand forecasting with artificial neural networks and neuro-fuzzy models: A comparative analysis [J].
Efendigil, Tugba ;
Onut, Semih ;
Kahraman, Cengiz .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) :6697-6707
[8]  
Fruhwirth Thom., 2003, COG TECH
[9]   The modelling and design process of coordination mechanisms in the supply chain [J].
Grzybowska, Katarzyna ;
Kovacs, Gabor .
JOURNAL OF APPLIED LOGIC, 2017, 24 :25-38
[10]   Risk-based estimation of manufacturing order costs with artificial intelligence [J].
Klosowski, Grzegorz ;
Gola, Arkadiusz .
PROCEEDINGS OF THE 2016 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2016, 8 :729-732