Pressure balance shield pipe jacking to avoid contamination

被引:0
|
作者
Boscardin, MD
Wooten, RL
Taylor, JM
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An earth pressure balance (EPB) tunnel boring machine (TBM) and pipe jacking were used to construct a 430-meter-long segment of sanitary sewer force main. The force main was constructed by first jacking a 2045-mm-outside-diameter, reinforced concrete cylinder pipe (RCCP) casing through alluvial sands and gravels. Later, a 1220-mm-diameter, ductile iron carrier pipe was installed within the casing pipe. The main concern affecting the construction method selection was the elimination of the need for dewatering, which could cause groundwater flow from deeper, contaminated sands up across a silt aquitard into cleaner, shallower sands. In addition, the method selected reduced the volume of soil to be handled and, consequentially, the potential amount of contaminated soil to be managed. Items discussed in the paper include provisions for handling boulders and controlling ground movements as excavation and jacking occurred approximately 300 mm beneath an active, 4800 kPa, 254-mm-diameter natural gas transmission pipeline.
引用
收藏
页码:843 / 850
页数:8
相关论文
共 50 条
  • [1] Jacking Forces with Shield Tunneling and Pipe Jacking in Mantle Rock.
    Herzog, Max
    BMT. Baumaschine + Bautechnik, 1985, 32 (06): : 236 - 238
  • [2] Earth pressure on shield excavation face for pipe jacking considering arching effect
    Ji, Xinbo
    Ni, Pengpeng
    Barla, Marco
    Zhao, Wen
    Mei, Guoxiong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 72 : 17 - 27
  • [3] Pipe jacking to avoid contaminated groundwater conditions
    Boscardin, MD
    Wooten, RL
    Taylor, JM
    TRENCHLESS PIPELINE PROJECTS: PRACTICAL APPLICATIONS, 1997, : 135 - 142
  • [4] A preprotection method for a pipe jacking channel over shield tunnels
    Cui, Yunliang
    Yang, Xukun
    Wang, Xinquan
    Diao, Hongguo
    Li, Xiao
    Gao, Yuanyuan
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2023, 71 (06)
  • [5] Model tests and discrete element analysis on jacking force of shield shaft vertical pipe jacking
    Wei L.
    Yang C.
    Mo H.
    Chen J.
    Xu S.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2021, 52 (10): : 3595 - 3604
  • [6] Case Study of the Largest Concrete Earth Pressure Balance Pipe-Jacking Project in the World
    Jiang, Xi
    Zhang, Xuehui
    Wang, Shuai
    Bai, Yun
    Huang, Baoshan
    TRANSPORTATION RESEARCH RECORD, 2022, 2676 (07) : 92 - 105
  • [7] Study on excavation stability of shallow rectangular shield pipe jacking tunnel
    Wantao Ding
    Zhongrong Wang
    Xinghang Huang
    Rui Chen
    Lewen Zhang
    Yingjie Zheng
    Xiaowei Guo
    Arabian Journal of Geosciences, 2022, 15 (8)
  • [8] Indoor model tests on the construction of vertical pipe jacking in shield tunnel
    Wei G.
    Hao W.
    Wei X.-J.
    Wang X.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 (01): : 62 - 71
  • [9] PIPE JACKING
    HOUGH, CM
    HOOK, GS
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1978, 64 (MAY): : 371 - 373
  • [10] PIPE JACKING
    DOODY, JP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1984, 76 (AUG): : 787 - 790