FUZZY CLUSTERING CHAOTIC-BASED DIFFERENTIAL EVOLUTION FOR RESOURCE LEVELING IN CONSTRUCTION PROJECTS

被引:18
作者
Cheng, Min-Yuan [1 ]
Tran, Duc-Hoc [1 ,2 ]
Hoang, Nhat-Duc [3 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Civil & Construct Engn, 43,Sec 4,Keelung Rd, Taipei 106, Taiwan
[2] Univ DaNang, Univ Sci & Technol, Fac Project Management, 54 Nguyen Luong Bang Rd, Danang, Vietnam
[3] Duy Tan Univ, Inst Res & Dev, P809-K7-25 Quang Trung, Danang, Vietnam
关键词
resource levelling; fuzzy clustering; chaotic; differential evolution; construction management; ANT COLONY OPTIMIZATION; GENETIC ALGORITHM; ALLOCATION;
D O I
10.3846/13923730.2014.982699
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project scheduling is an important part of project planning in many management companies. Resource leveling problem describes the process of reducing the fluctuations in resource usage over the project duration. The goal of resource leveling is to minimize the incremental demands that cause fluctuations of resources, and thus avoid undesirable cyclic hiring and firing during project execution. In this research, a novel optimization model, named as Fuzzy Clustering Chaotic-based Differential Evolution for solving Resource leveling (FCDE-RL), is introduced. Fuzzy Clustering Chaotic-based Differential Evolution (FCDE) is developed by integrating original Differential Evolution with fuzzy c-means clustering and chaotic techniques to tackle complex optimization problems. Chaotic was exploited to prevent the optimization algorithm from premature convergence. Meanwhile, fuzzy c-means clustering acts as several multi-parent crossover operators to utilize the information of the population efficiently to enhance the convergence. Experimental results revealed that the new optimization model is a promising alternative to assist project managers in dealing with construction project resource leveling.
引用
收藏
页码:113 / 124
页数:12
相关论文
共 43 条
[1]   A multipopulation cultural algorithm using fuzzy clustering [J].
Alami, J. ;
El Imrani, A. ;
Bouroumi, A. .
APPLIED SOFT COMPUTING, 2007, 7 (02) :506-519
[2]  
[Anonymous], 2004, Wiley InterScience electronic collection.
[3]   Selecting a delay analysis method in resolving construction claims [J].
Department of Civil and Architectural Engineering, Illinois Institute of Technology, Construction Engineering and Management Program, 3201 South Dearborn Street, Chicago, IL 60616, United States .
Int. J. Proj. Manage., 2006, 2 (145-155) :145-155
[4]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[5]   FCM - THE FUZZY C-MEANS CLUSTERING-ALGORITHM [J].
BEZDEK, JC ;
EHRLICH, R ;
FULL, W .
COMPUTERS & GEOSCIENCES, 1984, 10 (2-3) :191-203
[6]   A clustering-based differential evolution for global optimization [J].
Cai, Zhihua ;
Gong, Wenyin ;
Ling, Charles X. ;
Zhang, Harry .
APPLIED SOFT COMPUTING, 2011, 11 (01) :1363-1379
[7]   Dynamic guiding particle swarm optimization with embedded chaotic search for solving multidimensional problems [J].
Cheng, Min-Yuan ;
Huang, Kuo-Yu ;
Chen, Hung-Ming .
OPTIMIZATION LETTERS, 2012, 6 (04) :719-729
[8]   Minimum Moment Method for Resource Leveling Using Entropy Maximization [J].
Christodoulou, Symeon E. ;
Ellinas, Georgios ;
Michaelidou-Kamenou, Anastasia .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) :518-527
[9]  
Clerc M., 2006, Particle Swarm Optimization
[10]   IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY [J].
Damci, Atilla ;
Polat, Gul .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (04) :537-547