Bi-objective resource-constrained project scheduling problem with time-dependent resource costs

被引:12
作者
Alcaraz, Javier [1 ,2 ]
Anton-Sanchez, Laura [1 ,2 ]
Saldanha-da-Gama, Francisco [3 ,4 ]
机构
[1] Univ Miguel Hernandez, Dept Estadist Matemat & Informat, Elche 03202, Alicante, Spain
[2] Univ Miguel Hernandez, Ctr Invest Operat, Elche 03202, Alicante, Spain
[3] Univ Lisbon, Fac Ciencias, Dept Estat & Invest Operac, P-1749016 Lisbon, Portugal
[4] Univ Lisbon, Fac Ciencias, Ctr Matemat Aplicacoes Fundamentais & Invest Oper, PL-1749016 Lisbon, Portugal
关键词
Resource-constrained project scheduling; problem; Time-dependent resource costs; Makespan; Multi-objective optimization; Exact Pareto front; Metaheuristics; GENETIC ALGORITHM; DISCRETE-TIME; OPTIMIZATION; EXTENSIONS; VARIANTS;
D O I
10.1016/j.jmsy.2022.05.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work provides new insights on bi-criteria resource-constrained project scheduling problems. We define a realistic problem where the objectives to combine are the makespan and the total cost for resource usage. Timedependent costs are assumed for the resources, i.e., they depend on when a resource is used. An optimization model is presented and it is followed by the development of an algorithm aiming at finding the set of Pareto solutions. The intractability of the optimization models underlying the problem also justifies the development of a metaheuristic for approximating the same front. We design a bi-objective evolutionary algorithm that includes problem-specific knowledge and is based on the Non-dominated Sorting Genetic Algorithm (NSGA-II). The results of extensive computational experiments performed using instances built from those available in the literature are reported. The results demonstrate the efficiency of the metaheuristic proposed.
引用
收藏
页码:506 / 523
页数:18
相关论文
共 64 条
[1]   Bi-objective resource-constrained project scheduling with robustness and makespan criteria [J].
Abbasi, Babak ;
Shadrokh, Shahram ;
Arkat, Jamal .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) :146-152
[2]  
Abdolshah M, 2014, INT TRANS J ENG MANA, V5, P253
[3]   Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks [J].
Abello, Manuel Blanco ;
Michalewicz, Zbigniew .
SCIENTIFIC WORLD JOURNAL, 2014,
[4]   Project scheduling under time dependent costs - A branch and bound algorithm [J].
Achuthan, NR ;
Hardjawidjaja, A .
ANNALS OF OPERATIONS RESEARCH, 2001, 108 (1-4) :55-74
[5]   A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations [J].
Afruzi, Elham Nabipoor ;
Najafi, Amir Abbas ;
Roghanian, Emad ;
Mazinani, Mostafa .
COMPUTERS & OPERATIONS RESEARCH, 2014, 50 :80-96
[6]   A bi-objective model for robust resource-constrained project scheduling [J].
Al-Fawzan, MA ;
Haouari, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) :175-187
[7]   Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [J].
Alcaraz, J ;
Maroto, C ;
Ruiz, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) :614-626
[8]   A robust genetic algorithm for resource allocation in project scheduling [J].
Alcaraz, J ;
Maroto, C .
ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) :83-109
[9]  
Alcaraz J, 2006, INT SER OPER RES MAN, V92, P249, DOI 10.1007/978-0-387-33768-5_10
[10]  
[Anonymous], 2015, P COMP PUBL 2015 ANN, DOI DOI 10.1145/2739482.2768462