Neuro-short-term load forecast of the power system in Kuwait

被引:6
作者
AlFuhaid, AS [1 ]
ElSayed, MA [1 ]
Mahmoud, MS [1 ]
机构
[1] KUWAIT UNIV,DEPT ELECT & COMP ENGN,SAFAT 13060,KUWAIT
关键词
artificial neural networks; load forecast; power systems;
D O I
10.1016/S0307-904X(96)00165-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is concerned with short-term load forecast of the electrical power system in Kuwait. it applies artificial neural networks (ANN's) to predict the half hour total system load. The input pattern incorporates the temperature and humidity effects. Simulation results have indicated that the developed forecasting approach is flexible and efficient. (C) 1997 by Elsevier Science Inc.
引用
收藏
页码:215 / 219
页数:5
相关论文
共 11 条
[1]  
BRACE MC, 1991, P 1 FOR APPL NEUR NE, P31
[2]   SHORT-TERM LOAD FORECASTING USING GENERAL EXPONENTIAL SMOOTHING [J].
CHRISTIAANSE, WR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1971, PA90 (02) :900-+
[3]  
DEVILLIERS J, 1992, IEEE T NEURAL NETWOR, V4, P136
[4]   ARTIFICIAL NEURAL NETWORK APPLICATIONS TO POWER-SYSTEMS AND THEIR RELATIONSHIP TO SYMBOLIC METHODS [J].
DILLON, TS .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1991, 13 (02) :66-72
[5]   SHORT-TERM LOAD FORECASTING USING AN ADAPTIVE NEURAL NETWORK [J].
DILLON, TS ;
SESTITO, S ;
LEUNG, S .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1991, 13 (04) :186-192
[6]  
HO K, 1992, IEEE T POWER SYST, V7
[7]  
*IEEE COMM, 1980, IEEE T POWER APPL SY, V99, P53
[8]  
Marquez L., 1991, P 24 ANN HAW INT C S, V4, P129
[9]  
*MIN EL WAT, 1994, STAT YB EL EN
[10]  
PARK Y, 1989, P ESAPS, P244