Flexible open shop scheduling problem to minimize makespan

被引:43
作者
Bai, Danyu [1 ,2 ]
Zhang, Zhi-Hai [2 ]
Zhang, Qiang [3 ]
机构
[1] Shenyang Univ Chem Technol, Sch Econ & Management, Shenyang 110142, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[3] Northeastern Univ, Software Coll, Shenyang 110819, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Flexible open shop; Makespan; Asymptotic analysis; Differential evolution algorithm; DIFFERENTIAL EVOLUTION ALGORITHM; MULTIPROCESSOR OPEN SHOP; PARALLEL MACHINES; SETUP TIMES;
D O I
10.1016/j.cor.2015.10.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study investigates the static and dynamic versions of the flexible open shop scheduling problem with the goal of minimizing makespan. The asymptotic optimality of the general dense scheduling (GDS) algorithm is proven by the boundedness hypothesis. For large-scale problems, the GDS-based heuristic algorithms are presented to accelerate convergence. For moderate-scale problems, the differential evolution algorithm is employed to obtain high-quality solutions. A series of random experiments are conducted to demonstrate the effectiveness of the proposed algorithms. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:207 / 215
页数:9
相关论文
共 50 条
  • [31] Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
    Liu, SQ
    Ong, HL
    Ng, KM
    ADVANCES IN ENGINEERING SOFTWARE, 2005, 36 (03) : 199 - 205
  • [32] Efficient Genetic Algorithm for Flexible Job-Shop Scheduling Problem Using Minimise Makespan
    Farashahi, Hamid Ghaani
    Baharudini, B. T. H. T.
    Shojaeipour, Shahed
    Jaberi, Mohammad
    INTELLIGENT COMPUTING AND INFORMATION SCIENCE, PT II, 2011, 135 : 385 - +
  • [33] Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan
    Jatinder N.D. Gupta
    Christos P. Koulamas
    George J. Kyparisis
    Chris N. Potts
    Vitaly A. Strusevich
    Annals of Operations Research, 2004, 129 : 171 - 185
  • [34] General variable neighborhood search algorithm to minimize makespan of the distributed no-wait flow shop scheduling problem
    Komaki M.
    Malakooti B.
    Production Engineering, 2017, 11 (3) : 315 - 329
  • [35] Flow shop scheduling to minimize makespan with decreasing time-dependent job processing times
    Wang, Xiao-Yuan
    Wang, Ming-Zheng
    Wang, Ji-Bo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 840 - 844
  • [36] A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan
    Wang, Hui-Mei
    Chou, Fuh-Der
    Wu, Ful-Chiang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (5-8) : 761 - 776
  • [37] A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan
    Hui-Mei Wang
    Fuh-Der Chou
    Ful-Chiang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 761 - 776
  • [38] The Open Shop Scheduling Problem
    Woeginger, Gerhard J.
    35TH SYMPOSIUM ON THEORETICAL ASPECTS OF COMPUTER SCIENCE (STACS 2018), 2018, 96
  • [39] Hybrid Flow Shop Scheduling With Learning Effects and Release Dates to Minimize the Makespan
    Wang, Xinyue
    Ren, Tao
    Bai, Danyu
    Chu, Feng
    Lu, Xinyu
    Weng, Zedong
    Li, Jiang
    Liang, Jie
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2024, 54 (01): : 365 - 378
  • [40] Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
    Gupta, JND
    Koulamas, CP
    Kyparisis, GJ
    Potts, CN
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) : 171 - 185