Calculation Methods of Direct Lightning Shielding in ± 800kV Converter Station

被引:0
作者
Luo Jianbin [1 ]
HaoYanpeng [1 ]
Li Licheng [1 ]
Liu Qin [1 ]
Mao Changgen [1 ]
Han Yongxia [2 ]
机构
[1] South China Univ Technol, Sch Elect Power, Guangzhou, Peoples R China
[2] Guangdong Elect Power Design Inst, Guangzhou, Peoples R China
来源
2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC) | 2011年
关键词
UHVDC; EGM; strike distance; lightning rod; rolling ball method;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The height of electrical equipment in the converter station increases with the increase of voltage level of power transmission system, and the limitation of the existing calculation methods of protection range of lightning rod is gradually being revealed. Based on the theoretical analysis of the electrogeometric model (EGM), a new design scheme of lightning rod for ultra high voltage direct current (UHVDC) converter stations was put forward. This method can calculate maximum allowable stroke current. When a shielding failure of small lightning current occurs, combining installation of arrester and the protection scope of the lightning rod, provides better protection for large stroke current, and ensures that the stroke current is within the range which arresters withstand in the meanwhile. Furthermore, it enables the average height of lightning rod to be lower. That reduces the chance that the lightning rod may attract lightning strike. Therefore, it alleviates the EMI of lightning current to the converter substation.
引用
收藏
页数:4
相关论文
共 10 条
  • [1] [Anonymous], GB500571994
  • [2] [Anonymous], 102411990 IEC
  • [3] [Anonymous], 6201997 DLT
  • [4] [Anonymous], 9981996 IEEE
  • [5] Golde R.H., 1973, LIGHTNING PROTECTION
  • [6] Ma Hongda, 1998, MODELLING EXPT THEOR
  • [7] RAMASWAMI V., 2005, CSG TECHNOLOGY RES, V1, P1
  • [8] XU Ying, 2004, GUANGDONG ELECT POWE, V17
  • [9] XU Ying, 2005, GUANGDONG ELECT POWE, V18
  • [10] ZHOU Decai, 2009, SO POWER SYSTEM TECH, V3