Single machine earliness-tardiness scheduling with resource-dependent release dates

被引:7
|
作者
Ventura, JA
Kim, D
Garriga, F
机构
[1] Penn State Univ, Harold & Inge Marcus Dept Ind & Mfg Eng, University Pk, PA 16802 USA
[2] AspecTech, Youngdeungpo Ku, Seoul 150763, South Korea
[3] Univ Politecn Catalunya, Escola Tecn Super Engn Ind, Dept Organitzacio Empresses, Terrassa 08222, Barcelona, Spain
关键词
scheduling theory; dynamic programming; heuristics; computational analysis;
D O I
10.1016/S0377-2217(01)00292-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with the single machine earliness and tardiness scheduling problem with a common due date and resource-dependent release dates. It is assumed that the cost of resource consumption of a job is a non-increasing linear function of the job release date, and this function is common for all jobs. The objective is to find a schedule and job release dates that minimize the total resource consumption, and earliness and tardiness penalties. It is shown that the problem is NP-hard in the ordinary sense even if the due date is unrestricted (the number of jobs that can be scheduled before the due date is unrestricted). An exact dynamic programming (DP) algorithm for small and medium size problems is developed. A heuristic algorithm for large-scale problems is also proposed and the results of a computational comparison between heuristic and optimal solutions are discussed. (C) 2002 Elsevier Science B.V. All rights reserved.