Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality

被引:21
作者
Ben-Ammar, Oussama [1 ]
Bettayeb, Belgacem [2 ]
Dolgui, Alexandre [1 ]
机构
[1] IMT Atlantique, LS2N, Nantes, France
[2] CESI Grp, LINEACT Lab, Mont St Aignan, France
关键词
production planning; cycle time uncertainty; imperfect linear production process; quality control; SERIAL PRODUCTION SYSTEMS; SUPPLY-CHAIN; LEAD TIME; LEADTIMES; OPTIMIZATION; SIMULATION; IMPACT;
D O I
10.1080/00207543.2019.1613580
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work considers serial production systems with several process steps and a possible quality control at final step. It deals with the problem of optimising planned lead time when the real lead time for each process is stochastic and the finished product quality is uncertain unless it is inspected. Three analytical models are proposed aiming to minimise the expected total cost, which is composed of the inventory and backlogging costs for the finished product and quality costs associated with inspection and non-conformities. These models correspond to three quality control policies: (i) without quality control, (ii) with quality control but without taking into account the inspection duration when optimising the planned lead time and (iii) with quality control and with considering the inspection duration when optimising the planned lead time. Based on the results, it can be highlighted the economic advantage of integrating quality control at the early stage of supply and production planning decisions for some cost parameters conditions. The robustness of the proposed models is also analysed regarding the variance of the probability distributions of the lead times.
引用
收藏
页码:1144 / 1160
页数:17
相关论文
共 33 条
[1]   A bibliography of non-deterministic lot-sizing models [J].
Aloulou, Mohamed Ali ;
Dolgui, Alexandre ;
Kovalyov, Mikhail Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) :2293-2310
[2]  
Ben Ammar O, 2014, IFIP ADV INF COMM TE, V440, P368
[3]  
Ben-Ammar O., 2017, INT C IND ENG SYST M
[4]   Planned lead times optimization for multi-level assembly systems under uncertainties [J].
Ben-Ammar, Oussama ;
Dolgui, Alexandre ;
Wu, Desheng Dash .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 78 :39-56
[5]   Quality control planning to prevent excessive scrap production [J].
Bettayeb, B. ;
Bassetto, S. J. ;
Sahnoun, M. .
JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (03) :400-411
[6]   Integrated dynamic single item lot-sizing and quality inspection planning [J].
Bettayeb, Belgacem ;
Brahimi, Nadjib ;
Lemoine, David .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (07) :2611-2627
[7]   SAFETY STOCK VERSUS SAFETY TIME IN MRP CONTROLLED PRODUCTION SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
MANAGEMENT SCIENCE, 1994, 40 (12) :1678-1689
[8]   Impact of quality control on production system performance [J].
Colledani, M. ;
Tolio, T. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2006, 55 (01) :453-456
[9]   A review of discrete-time optimization models for tactical production planning [J].
Diaz-Madronero, Manuel ;
Mula, Josefa ;
Peidro, David .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (17) :5171-5205
[10]   A simulation optimization methodology for supplier selection problem [J].
Ding, HW ;
Benyoucef, L ;
Xie, XL .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2005, 18 (2-3) :210-224