Load settlement behavior of large diameter bored piles in over-consolidated clay

被引:0
作者
El-Mossallamy, Y [1 ]
机构
[1] Ain Shams Univ, Cairo, Egypt
来源
NUMERICAL MODELS IN GEOMECHANICS - NUMOG VII | 1999年
关键词
D O I
暂无
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Currently large diameter bored piles represent a very Powerful geotechnical foundation element which are suitable for most subsoil conditions. A complete and realistic consideration of the pile soil interaction is necessary to achieve a reliable, efficient and economic construction. A method based on the theory of elasticity was developed to model the behavior of a single pile applying Mindlin's equation for a point load embedded in an elastic half space as the basic integral function in a boundary element solution. This basic solution was then improved to take into account the effect of a finite half space, soil non-homogeneity and non-linear pile response. To examine the validity of this technique the performance of a well monitored axially loaded single pile in overconsolidated clay was analyzed applying the above mentioned method. Additionally a finite element analysis was carried out applying different: constitutive laws. Both the traditional Mohr-Coulomb model and the more enhanced hardening soil model were applied. The above mentioned boundary element method is further developed to consider the pile group action. A comparison between measurements and the results of the numerical analysis will be presented and discussed.
引用
收藏
页码:443 / 450
页数:8
相关论文
共 50 条
  • [31] Applications of large-diameter bored piles in the United States
    O'Neill, MW
    DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 3 - 19
  • [32] Creep tests and creep model for reconstituted over-consolidated saturated clay
    Hu M.
    Xiao B.
    Lu Y.
    Zhang Y.
    Zhang Y.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2023, 45 : 6 - 10
  • [33] Automated True Triaxial Apparatus and its Application to Over-consolidated Clay
    Ye, Guan-lin
    Sheng, Jia-ren
    Ye, Bin
    Wang, Jian-hua
    GEOTECHNICAL TESTING JOURNAL, 2012, 35 (04): : 517 - 528
  • [34] Numerical Simulation of Vertical Cyclic Responses of a Bucket in Over-Consolidated Clay
    Jiang, Jun
    Luo, Chengxi
    Wang, Dong
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (08)
  • [35] Behavior of large bored piles with grouted end
    Zhang, YN
    Liu , XA
    DFI 2004: DEEP FOUNDATIONS INSTITUTE, CONFERENCE PROCEEDINGS, 2004, : 285 - 290
  • [36] Permissible Loading of Large-Diameter Bored Piles.
    Feda, Jaroslav
    1600, (63):
  • [37] LATERAL LOAD CAPACITY OF PILES IN SAND AND NORMALLY CONSOLIDATED CLAY
    SINGH, A
    HU, REW
    COUSINEA.RD
    CIVIL ENGINEERING, 1971, 41 (08): : 52 - &
  • [38] The progressive development of a failure slip surface in over-consolidated clay at Selborne, UK
    Cooper, MR
    LANDSLIDES-BK, 1996, : 683 - 688
  • [39] SETTLEMENT ANALYSIS OF LARGE-DIAMETER BORED PILE GROUPS
    YAMASHITA, K
    KAKURAI, M
    MATSUYAMA, K
    PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1989, : 1079 - 1082
  • [40] The performance of large diameter bored piles used for a road project in Malaysia
    Jamaludin, A
    Hussein, AN
    DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 335 - 339