A two-stage flow shop scheduling problem with transportation considerations
被引:8
作者:
Chikhi, Nacira
[1
,2
]
Abbas, Moncef
[1
]
Benmansour, Rachid
[2
]
Bekrar, Abdelghani
[2
]
Hanafi, Said
[2
]
机构:
[1] Univ Sci & Technol USTHB, Lab AMCD & RO, Bab Ezzouar 16111, Alger, Algeria
[2] Univ Valenciennes & Hainaut Cambresis, LAMIH UMR CNRS 8201, F-59313 Le Mt Houy 9, Valenciennes, France
来源:
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH
|
2015年
/
13卷
/
04期
关键词:
Scheduling;
Robotic flow shop;
Transport;
Two-stage;
Makespan;
COMMON 2ND-STAGE MACHINE;
DEDICATED MACHINES;
TIMES;
MAKESPAN;
JOB;
D O I:
10.1007/s10288-015-0297-4
中图分类号:
C93 [管理学];
O22 [运筹学];
学科分类号:
070105 ;
12 ;
1201 ;
1202 ;
120202 ;
摘要:
This paper considers a two-stage robotic flow shop scheduling problem of which the objective is to minimize the maximum completion time of all the jobs. The problem consists of two dedicated machines at the first stage and a single machine at the second stage. Each job is defined by two operations processed in series on two stages. Depending on the job type, each job is processed on a dedicated machine at the first stage, and is then transported, by a robot or a conveyor, to be processed on a single machine at the second stage. To tackle the problem, a mixed integer programming model is proposed, which is solved by CPLEX. This model is improved using valid inequalities based on three lower bounds. In addition, we establish the complexity of several variations of the problem and we identify special cases that can be solved in polynomial time. Furthermore due to the NP-hardness of the problem, two heuristics are proposed to solve approximately large-sized problems. The results indicate that the solutions obtained are of high quality and the corresponding CPU time is acceptable.