Integration of an MMC-HVDC Link to the Existing LCC-HVDC Link in Balearic Islands Based on Grid-Following and Grid-Forming Operation

被引:7
作者
Collados-Rodriguez, Carlos [1 ]
Cheah-Mane, Marc [1 ]
Cifuentes-Garcia, Francisco [1 ]
Prieto-Araujo, Eduardo [1 ]
Gomis-Bellmunt, Oriol [1 ]
Coronado, Luis [2 ]
Longas, Carmen [2 ]
Sanz, Silvia [2 ]
Martin, Macarena [2 ]
Cordon, Antonio [2 ]
机构
[1] Univ Politecn Catalunya UPC, Ctr Innovacio Tecnol Convertidors Estat & Acciona, Dept Engn Elect, Barcelona 08028, Spain
[2] Red Elect Espana, Alcobendas 28109, Spain
关键词
Grid-following; grid-forming; HVDC; transient analysis; DESIGN;
D O I
10.1109/TPWRD.2022.3175251
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The decarbonization plans are leading to the decommissioning of conventional power plants, resulting in a deep transformation of power systems. Balearic Islands are not an exception and, in order to compensate this generation reduction and increase the security of supply, a second HVDC link is planned to interconnect the Balearic power system to the Spanish mainland. In this application paper, Modular Multilevel Converters (MMCs) have been assumed as the preferred technology for this HVDC link. A transient analysis has been presented to evaluate the system performance after the introduction of this new HVDC link. Grid-following and grid-forming control strategies have been implemented, comparing their impact on the system performance and stability. The transient events considered are the disconnections of the main synchronous generators of the islands and AC faults in several locations of the Balearic power system. A final case based on a penetration of 100% of converter-based resources has been also simulated to study the islanded operation of the MMC-HVDC link.
引用
收藏
页码:5278 / 5288
页数:11
相关论文
共 35 条
[1]  
ABB Power Hitachi Grids, GOTL HVDC LINK
[2]  
[Anonymous], ESIOS SIST INF OP SI
[3]  
[Anonymous], 2016, 42152016 IEEE, P1, DOI [DOI 10.1109/IEEESTD.2006.99499, DOI 10.1109/IEEESTD.2016.7553421]
[4]  
Arcidiacono V., 1994, PROC INT C LARGE HIG, P14
[5]   THE CORSICAN TAPPING - FROM DESIGN TO COMMISSIONING TESTS OF THE 3RD TERMINAL OF THE SARDINIA CORSICA ITALY HVDC LINK [J].
BILLON, VC ;
TAISNE, JP ;
ARCIDIACONO, V ;
MAZZOLDI, F .
IEEE TRANSACTIONS ON POWER DELIVERY, 1989, 4 (01) :794-799
[6]  
Changhyun Kim, 2007, 3DTV Conference, 2007, P1
[7]  
박정수, 2011, 전기학회논문지, V60, P2196
[8]  
Ciapessoni E., 2018, PROC 110 AEIT INT AN, P1, DOI 10.23919/PSCC.2018.8442508
[9]  
CIGRE, 2014, TECHN BROCH 604 GUID
[10]  
Coronado L, 2016, PROC EES UETP HVDC T