Risk analysis in plant commissioning: the Multilevel Hazop

被引:34
作者
Cagno, E [1 ]
Caron, F [1 ]
Mancini, M [1 ]
机构
[1] Politecn Milan, Dept Management Econ & Ind Engn, I-20133 Milan, Italy
关键词
commissioning; risk analysis; Hazop;
D O I
10.1016/S0951-8320(02)00064-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper deals with risk analysis and management in the realisation of process plants by engineering and contracting companies. Specifically, a new analytical methodology is developed to manage the typical risks of plant commissioning. Following a detailed study of the commissioning process and its criticalities, Hazop is selected as the most suitable approach in forecasting particular risks of this project stage. Starting from the limitations of both Hazop and Human Hazop (the extension of the technique to the field of procedures performed by humans), a new technique (Multilevel Hazop) is suggested which identifies in advance all the criticalities of each commissioning activity and defines actions to reduce risk and optimise dedicated resources. After implementation of Multilevel Hazop in a real commissioning process, a new version of the technique (Two Stage Multilevel Hazop) is proposed. This allows a significant reduction in implementation costs, justifying use of the technique both in innovative or critical cases, where the expected saving from risk reduction is high, and in general contexts. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:309 / 323
页数:15
相关论文
共 13 条
[1]  
*AICHE, 1992, GUID HAZ EV PROC
[2]  
*AICHE, 1985, US HAZ OP STUD PROC
[3]  
[Anonymous], HAZOP HAZAN NOTES ID
[4]  
CAGNO E, 2001, ESREL 2001 TUR IT 16
[5]  
GUTTMANN HE, 1983, NUREGCR1278
[6]  
HARSLEY DMC, 1990, PROCESS PLANT COMMIS
[7]  
HUMPHREYS P, 1988, 8895Q SRD RTS AEA TE
[8]  
*IBC VECTR TECHN L, 1995, TASK AN IND
[9]  
LAWLEY HG, 1974, CHEM ENG PROG, V70
[10]  
MUKESH D, 1994, CHEM ENG PROG, V76