Aggregative risk assessment model for information technology project development

被引:0
作者
Zeng, Yurong [1 ]
Wang, Lin [1 ]
Zhang, Jinlong [1 ]
机构
[1] Hubei Univ Econ, Dept Comp & Elect, Wuhan 430205, Peoples R China
来源
Fifth Wuhan International Conference on E-Business, Vols 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT | 2006年
关键词
information technology; risk assess; fuzzy; grey;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Any development of information technology (IT) project entails some level of risk. Reasonable risk analysis can enhance the chance of successful electronic business project implementation. In this paper, related risk assessment indexes associated with IT project development are put forward from the aspect of personnel, system requirement, schedules and budges, developing technology, external resource and performance. At the same time, a risk assessment model is proposed by using of fuzzy set and grey theory and its effectiveness and feasibility are tested in a practical example. The model can assist the decision-makers to understand the current risks more intensively and assess the overall risks in a more exact way.
引用
收藏
页码:1139 / 1144
页数:6
相关论文
共 50 条
[31]   In search of information technology productivity: Assessment issues [J].
Willcocks, LP ;
Lester, S .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (11) :1082-1094
[32]   PROJECT REPORT - THE USE OF PILOT TO TEACH INFORMATION TECHNOLOGY CONCEPTS [J].
NIXON, PD .
COMPUTERS AND THE HUMANITIES, 1993, 27 (04) :285-289
[33]   JOB DIAGNOSTIC SURVEY: A TEAM PROJECT INFORMATION TECHNOLOGY PERSPECTIVE [J].
Telles, Renato ;
Duarte, Ivandilson de Souza ;
Queiroz, Maciel Manoel ;
Novaes, Natalia .
REVISTA CIENTIFICA HERMES, 2016, 16 :69-89
[34]   The influence of organizational factors over information technology (IT) project management [J].
Schneider, Ricardo Mattos ;
Pereira Barbosa, Jose Geraldo ;
Carino Bouzada, Marco Aurelio ;
Goncalves, Antonio Augusto .
REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2016, 16 (01) :157-183
[35]   A stage model of information technology in healthcare [J].
Yang Y. ;
Kankanhalli A. ;
Chandran S. .
Health and Technology, 2015, 5 (1) :1-11
[36]   An Information Technology Competency Model and Curriculum [J].
Impagliazzo, John ;
Alrumaih, Hala ;
Sabin, Mihaela ;
Viola, Barbara .
PROCEEDINGS OF 2016 IEEE GLOBAL ENGINEERING EDUCATION CONFERENCE (EDUCON2016), 2016, :892-895
[37]   Information Support to the Three Component Dynamic Model Development for Terrorist Risk Analysis [J].
Yudina, Olga N. ;
Dvoretskaya, Tamara N. ;
Silova, Tamara V. .
COMPARATIVE ANALYSIS OF TECHNOLOGICAL AND INTELLIGENT TERRORISM IMPACTS ON COMPLEX TECHNICAL SYSTEMS, 2012, 102 :21-29
[38]   Information technology and risk management in supply chains [J].
Fischer-Pressler, Diana ;
Eismann, Kathrin ;
Pietrowski, Rafael ;
Fischbach, Kai ;
Schoder, Detlef .
INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2020, 50 (02) :233-254
[39]   Risk Assessment Can Be a Game-Changing Information Technology-But Too Often It Isn't [J].
Goble, Robert ;
Bier, Vicki M. .
RISK ANALYSIS, 2013, 33 (11) :1942-1951
[40]   The impact of relational norms on information technology project success and its moderation through project governance [J].
Muller, Ralf ;
Martinsuo, Miia .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2015, 8 (01) :154-176