A solution to the stochastic unit commitment problem using chance constrained programming

被引:194
作者
Ozturk, UA [1 ]
Mazumdar, M
Norman, BA
机构
[1] Hawaii Pacific Univ, Coll Business Adm, Honolulu, HI 96813 USA
[2] Univ Pittsburgh, Dept Ind Engn, Pittsburgh, PA 15261 USA
基金
美国国家科学基金会;
关键词
chance constrained programming; electric power generation; spinning reserves; unit commitment;
D O I
10.1109/TPWRS.2004.831651
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper develops a solution method for scheduling units of a power-generating system to produce electricity by taking into consideration the stochasticity of the hourly load and its correlation structure. The unit commitment problem is initially formulated as a chance constrained optimization problem in which we require that the load be met with a specified high probability over the entire time horizon. The solution procedure consists of solving a sequence of deterministic versions of the unit commitment problem that converge to the solution of the chance constrained program. For the deterministic unit commitment problems, Lagrangian relaxation is used to separate the dual problem into its subproblems. Each subproblem is solved by a dynamic program. The initial results indicate that accounting for the correlation structure of the hourly loads reduces the value of the objective function when the optimization problem is formulated as a chance constrained program. Monte Carlo simulation is used to verify the accuracy of the solution provided by the algorithm. The relationship that the unit commitment solution found using the chance constrained optimization approach has with that found using conventional spinning reserves is discussed.
引用
收藏
页码:1589 / 1598
页数:10
相关论文
共 25 条
[1]   Operational planning for distribution system with windmills [J].
Abdelaziz, AR ;
El-Din, AAH .
ICSD '01: PROCEEDINGS OF THE 2001 IEEE 7TH INTERNATIONAL CONFERENCE ON SOLID DIELECTRICS, 2001, :442-445
[2]  
AROE CC, 1998, KONRAD ZUSE ZENTRUM
[3]  
BILLINGSLEY P, 1986, PROBABILITY MEASURE, P23
[4]  
Birge JR, 1997, INTRO STOCHASTIC PRO, P9
[5]  
BIRGE JR, INTELLIGENT UNIFIED
[6]   ECONOMIC GENERATION DISPATCH WITH RESPONSIVE SPINNING RESERVE CONSTRAINTS [J].
BOBO, DR ;
MAUZY, DM ;
TREFNY, FJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (01) :555-559
[7]   A GAUSS-MARKOV LOAD MODEL FOR APPLICATION IN RISK-EVALUATION AND PRODUCTION SIMULATION [J].
BREIPOHL, AM ;
LEE, FN ;
ZHAI, D ;
ADAPA, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (04) :1493-1499
[8]   Stochastic optimization of unit commitment: A new decomposition framework [J].
Carpentier, P ;
Cohen, G ;
Culioli, JC ;
Renaud, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :1067-1073
[9]   CHANCE-CONSTRAINED PROGRAMMING [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1959, 6 (01) :73-79
[10]  
DENTCHEVA D, 1998, LECT NOTES EC MATH S, P458