Study on Comprehensive Evaluation of Mine Construction Project Management Based on AHP-FUZZY

被引:0
|
作者
Gao, Xiaoqiang [1 ]
Zhu, Jingyan [2 ]
机构
[1] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] North China Univ Technol, Sch Civil Engn, Beijing 100144, Peoples R China
关键词
D O I
10.1088/1755-1315/237/3/032137
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Coal mine construction has investment huge, long cycle, high quality characteristics, higher requirements have been put forward for the mine construction project management. This paper establishes the three-level evaluation index system of mine construction project management from four aspects, which include the project goal, the owner, the supervision unit and the contractor, establishes the project management comprehensive evaluation model based on the AHP method and the FUZZY method, and combined with engineering examples to verify. The results show that the evaluation index system of the index is reasonable. The calculation results of the model is proved that the comprehensive evaluation result is the same as the actual result of the project and has good reliability. The evaluation index system and the evaluation model can provide reference for the evaluation of mine construction project management effect.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] A Quantitative Analysis of Lake Tourism Resource Value Based on AHP-fuzzy Comprehensive Evaluation Method
    Zeng Yan
    Bao Xiangping
    ADVANCED MATERIALS AND ENGINEERING MATERIALS II, 2013, 683 : 809 - 814
  • [32] Dust Explosion Risk Assessment for Dry Dust Collector Based on AHP-Fuzzy Comprehensive Evaluation
    Sun, Siheng
    Mao, Tingting
    Lv, Pengfei
    Pang, Lei
    PROCESSES, 2022, 10 (12)
  • [33] The Application of Fuzzy Comprehensive Evaluation Based on AHP in Risk Evaluation of Engineering Project
    Wang Chengjun
    Zuo Xinhui
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 108 - 112
  • [34] Application Research of AHP-Fuzzy Comprehensive Evaluation Based on Random Simulation in the Optimization of Ship Model
    Su Shaojuan
    Liu Yindong
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2009, : 1892 - 1897
  • [35] Comprehensive Evaluation Based on AHP-Fuzzy about the Conception of Underground Container Transportation Lines in Shanghai
    Zhang, Cheng
    Wang, Siwei
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 175 - +
  • [36] Assessment of water conservation and water intensification level based on AHP-fuzzy comprehensive evaluation model
    Lv, Cuimei
    Li, Shuang
    Ling, Minhua
    Niu, Zhaoying
    Yan, Denghua
    DESALINATION AND WATER TREATMENT, 2024, 319
  • [37] Efficiency Evaluation Model of Power Transmission & Transformation Project Investment Based on AHP-Fuzzy Method
    Tian, Guishen
    Liu, Jicheng
    Zhou, Jingjing
    Liu, Junli
    Li, Bing
    THERMAL, POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 732-733 : 1303 - 1307
  • [38] Evaluating Waterway Transit Capacity Based on AHP-Fuzzy Comprehensive Method
    Hou, Haiqiang
    Yu, Yuhuan
    Xu, Wuxiong
    Li, Yicheng
    INTERNATIONAL CONFERENCE ON TRANSPORTATION (ICTR 2013), 2013, : 300 - 305
  • [39] Study on the safety management level of coal mine based on fuzzy comprehensive evaluation
    He, AHong
    Kang, ShuZong
    Wang, XiuLi
    Hu, TianBao
    INFORMATION SCIENCE AND MANAGEMENT ENGINEERING, VOLS 1-3, 2014, 46 : 2665 - 2671
  • [40] The Assessment of Construction Project Safety Management Security System Based on the Fuzzy Comprehensive Evaluation
    Liu, Hao
    Wang, Yang
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 262 - 271