Study on Comprehensive Evaluation of Mine Construction Project Management Based on AHP-FUZZY

被引:0
|
作者
Gao, Xiaoqiang [1 ]
Zhu, Jingyan [2 ]
机构
[1] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] North China Univ Technol, Sch Civil Engn, Beijing 100144, Peoples R China
关键词
D O I
10.1088/1755-1315/237/3/032137
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Coal mine construction has investment huge, long cycle, high quality characteristics, higher requirements have been put forward for the mine construction project management. This paper establishes the three-level evaluation index system of mine construction project management from four aspects, which include the project goal, the owner, the supervision unit and the contractor, establishes the project management comprehensive evaluation model based on the AHP method and the FUZZY method, and combined with engineering examples to verify. The results show that the evaluation index system of the index is reasonable. The calculation results of the model is proved that the comprehensive evaluation result is the same as the actual result of the project and has good reliability. The evaluation index system and the evaluation model can provide reference for the evaluation of mine construction project management effect.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Study on the Rationality of Location Selection of Affordable Housing in Harbin Based on AHP-Fuzzy Comprehensive Evaluation Method
    Liu, Jingjin
    Wu, Yongxiang
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 1121 - 1124
  • [22] Suitability Evaluation of Hydrogen Production and Hydrogenation Station Based on AHP-Fuzzy Comprehensive Evaluation Method
    Zhang S.
    Xue J.
    Sun X.
    Energy Engineering: Journal of the Association of Energy Engineering, 2022, 119 (04): : 1547 - 1567
  • [23] Study on Project Management Ability Based on Fuzzy Comprehensive Evaluation
    Liu Shaobing
    Yue Pengwei
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2008, : 733 - 737
  • [24] Fuzzy Comprehensive Evaluation of Mine Production Business Status Based on AHP
    Sun, Yuncong
    Li, Tao
    ENVIRONMENT MATERIALS AND ENVIRONMENT MANAGEMENT, 2011, 281 : 169 - 173
  • [25] Synthetic evaluation of integrated energy system based on AHP-fuzzy comprehensive assessment method
    Lu, Xiao
    Wu, Jiajia
    Hu, Wei
    Chi, Changyun
    Jiang, Xuedong
    Li, Xiaobo
    2020 INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND BIOENGINEERING (ICEEB 2020), 2020, 185
  • [26] Evaluating Bilingual Teaching Quality for NC Based on AHP-Fuzzy Comprehensive Evaluation Approach
    Hu, Dongfang
    Ji, Yuanhao
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME), 2016, 71 : 811 - 817
  • [27] Risk Evaluation of Railway Construction Project Based on Fuzzy AHP
    Bai Yunfei
    Ren Xun
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4297 - 4300
  • [28] The Establishment of AHP-Fuzzy Model for Comprehensive Evaluation of "City Obesity" Degree
    Xiang, Suying
    Li, Xiaofeng
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND ELECTRONIC TECHNOLOGY, 2015, 6 : 56 - 62
  • [29] University Campus Safety Based on the AHP-Fuzzy Evaluation
    Wei, Wang
    Long, DaiGuang
    Chen, Lv
    APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 4239 - 4243
  • [30] Evaluation method of solid construction waste recycling capacity based on AHP-fuzzy algorithm
    Zhang, Xiaohua
    Xing, Jiayue
    Gao, Zong
    Zhang, Hongyu
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL TECHNOLOGY AND MANAGEMENT, 2022, 25 (04) : 273 - 284