Study on Comprehensive Evaluation of Mine Construction Project Management Based on AHP-FUZZY

被引:0
作者
Gao, Xiaoqiang [1 ]
Zhu, Jingyan [2 ]
机构
[1] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] North China Univ Technol, Sch Civil Engn, Beijing 100144, Peoples R China
来源
4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING | 2019年 / 237卷
关键词
D O I
10.1088/1755-1315/237/3/032137
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Coal mine construction has investment huge, long cycle, high quality characteristics, higher requirements have been put forward for the mine construction project management. This paper establishes the three-level evaluation index system of mine construction project management from four aspects, which include the project goal, the owner, the supervision unit and the contractor, establishes the project management comprehensive evaluation model based on the AHP method and the FUZZY method, and combined with engineering examples to verify. The results show that the evaluation index system of the index is reasonable. The calculation results of the model is proved that the comprehensive evaluation result is the same as the actual result of the project and has good reliability. The evaluation index system and the evaluation model can provide reference for the evaluation of mine construction project management effect.
引用
收藏
页数:6
相关论文
共 7 条
  • [1] He M. S, 2014, J MANAGER, V12, P306
  • [2] Ke Y. X, 2011, J CONSTRUCTION SUPER, V08
  • [3] Management of Variceal Hemorrhage
    Li, Yan
    Zhang, Chun Qing
    [J]. GASTROENTEROLOGY RESEARCH, 2009, 2 (01) : 8 - 19
  • [4] Su J. M., 2008, J COAL SCI TECHNOLOG, V12, P105
  • [5] Yang R. S., 2010, J MINE CONSTRUCTION, V03
  • [6] ZHANG T N, 2002, J HARBIN ENG U, V23, P132
  • [7] Zhi H. B., 2004, J SCI TECHNOLOGY REV, V11, P44