Application of chance-constrained programming for stochastic group shop scheduling problem

被引:9
作者
Ahmadizar, Fardin [1 ]
Ghazanfari, Mehdi [1 ]
Ghomi, Seyyed Mohammad Taghi Fatemi [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran 1684613114, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Group shops scheduling; Uncertain release dates and processing times; Total weighted completion time; Chance-constrained programming; Ant colony algorithm; Heuristic algorithm; 2-MACHINE FLOW SHOPS; EXPECTED MAKESPAN; RANDOM OPERATIONS; OPTIMIZATION; COLONY; ALGORITHMS; SUBJECT; BOUNDS;
D O I
10.1007/s00170-008-1594-2
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we study a group shop scheduling (GSS) problem subject to uncertain release dates and processing times. The GSS problem is: a general formulation including the other shop scheduling problems such as the flow shop, the job shop, and the open shop scheduling problems. The objective is to find a job schedule which minimizes the total weighted completion time. We solve this problem based on the chance-constrained programming. First, the problem is fomulated in a form of stochastic programming and then prepared in a form of deterministic mixed binary integer linear programming such that it can be solved by a linear programming solver. To solve the problem efficiently, we develop an efficient hybrid method. Exploiting a heuristic algorithm in order to satisfy the constraints, an ant colony optimization algorithm is applied to construct high-quality solutions to the problem. The proposed approach is tested on instances where the random variables are normally, uniformly, or exponentially distributed.
引用
收藏
页码:321 / 334
页数:14
相关论文
共 42 条
[1]   An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns [J].
Alcaide, D ;
Rodriguez-Gonzalez, A ;
Sicilia, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 140 (02) :384-398
[2]   A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures [J].
Alcaide, David ;
Rodriguez-Gonzalez, Andres ;
Sicilia, Joaquin .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2005, 17 (03) :201-226
[3]  
Allahverdi A., 2003, International Transactions in Operational Research, V10, P65, DOI 10.1111/1475-3995.00393
[4]  
[Anonymous], 2004, ANT COLONY OPTIMIZAT
[5]  
[Anonymous], 1964, Note DS No. 9 bis
[6]  
Bellman R.E., 1958, Q APPL MATH, V16, P87
[7]   The hyper-cube framework for ant colony optimization [J].
Blum, C ;
Dorigo, M .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2004, 34 (02) :1161-1172
[8]  
Blum C, 2002, IEEE C EVOL COMPUTAT, P1558, DOI 10.1109/CEC.2002.1004474
[9]  
Blum C., 2004, J MATH MODELLING ALG, V3, P285, DOI DOI 10.1023/B:JMMA.0000038614.39977.6F
[10]   CHANCE-CONSTRAINED PROGRAMMING [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1959, 6 (01) :73-79