Anchoring the software process

被引:71
作者
Boehm, B
机构
[1] University of California, Los Angeles, CA
[2] Center for Software Engineering, USC, Los Angeles
关键词
D O I
10.1109/52.526834
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
For a few golden moments in the mid-'70s, it appeared that the software field had found ii sequence of milestones around which people could plan, organize, monitor, and control their projects. These were the milestones in the waterfall model. They typically included the completion of system requirements, software requirements, preliminary design, detailed design, code, unit test, software acceptance test, and system acceptance test. Unfortunately, just as the waterfall model was becoming fully elaborated, people were finding that its milestones did not fit an increasing number of project situations. The risk-driven content of the three milestones proposed in this article let you tailor them to specific software situations, and at the same time they remain general enough to apply to most software projects.
引用
收藏
页码:73 / &
页数:12
相关论文
共 19 条
[1]  
[Anonymous], 1989, Software Risk Management
[2]  
BAMBERGER J, 1990, CMUSEI90TR32 CARN ME
[3]  
BOEHM B, 1995, ANN SOFTWARE ENG
[4]  
BOEHM BW, 1994, P ICSP 3
[5]  
BOEHM BW, 1989, IEEE T SOFTWARE ENG
[6]  
BOEHM BW, 1988, COMPUTER MAY, P61
[7]  
CARR MJ, 1993, CMUSEI93TR06 CARN ME
[8]  
Carroll JM, 1995, SCENARIO BASED DESIG, VFirst
[9]  
CHARETTE R, 1989, SOFTWARE ENG RISK AN
[10]  
Cusumano M., 1995, Microsoft Secrets