Risk Assessment for Using UAS in Construction: A Fuzzy Analytical Hierarchy Process

被引:0
作者
Xu, Yiye [1 ]
Turkan, Yelda [1 ]
机构
[1] Oregon State Univ, Sch Civil & Construct Engn, Corvallis, OR 97331 USA
来源
CONSTRUCTION RESEARCH CONGRESS 2022: HEALTH AND SAFETY, WORKFORCE, AND EDUCATION | 2022年
关键词
SAFETY; REQUIREMENTS; MANAGEMENT;
D O I
暂无
中图分类号
R318 [生物医学工程];
学科分类号
0831 ;
摘要
In the last decade, Unmanned Aerial Systems (UAS) have started being used in the construction industry at an increasing rate. Previous studies focused on exploring their applications for a variety of tasks as well as measuring their impact on productivity. However, potential risks associated with UAS use on job sites, which could result in injuries to workers and damage to the site or environment, have not been studied adequately. Thus, this study attempts to fill this gap by identifying, assessing, and prioritizing the safety risk factors associated with UAS implementation in construction using a Fuzzy Analytical Hierarchy Process (FAHP). A hierarchy model of safety risk factors associated with the use of UAS in construction was determined thorough literature review. In the next step, the identified risk factors were assessed based on the survey responses obtained from a qualified expert panel composed of members from both academia and industry. In the next step, the identified risk factors were ranked. This study makes an important contribution to practice by promoting awareness of the most serious safety risk factors associated with implementing UAS in construction. It is expected that industry professionals and decision makers could use this knowledge to design proper procedures and practices to mitigate high-level risks associated with using UAS in construction and take the necessary safety precautions.
引用
收藏
页码:441 / 451
页数:11
相关论文
共 33 条
[1]   Hazards identification and risk assessment for UAV-assisted bridge inspections [J].
Aliyari, Mostafa ;
Ashrafi, Behrooz ;
Ayele, Yonas Zewdu .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2022, 18 (03) :412-428
[2]  
[Anonymous], 2019, UAS SIGHT REP
[3]  
BLS (U.S. Bureau of Labor Statistics), 2021, EMPL MAJ IND SECT
[4]   Safety hazard identification on construction projects [J].
Carter, G ;
Smith, SD .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) :197-205
[5]   Applications and requirements of unmanned aerial systems (UASs) for construction safety [J].
Gheisari, Masoud ;
Esmaeili, Behzad .
SAFETY SCIENCE, 2019, 118 :230-240
[6]   INTEGRATION OF INNOVATION THROUGH ANALYTICAL HIERARCHY PROCESS (AHP) IN PROJECT MANAGEMENT AND PLANNING [J].
Gunduz, Murat ;
Alfar, Mohammed .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2019, 25 (02) :258-276
[7]   Qualitative Research: Application of the Delphi Method to CEM Research [J].
Hallowell, Matthew R. ;
Gambatese, John A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (01) :99-107
[8]   CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT [J].
Hossen, Muhammed Mufazzal ;
Kang, Sunkoo ;
Kim, Jonghyun .
NUCLEAR ENGINEERING AND TECHNOLOGY, 2015, 47 (03) :362-379
[9]   Unmanned aerial vehicles in construction and worker safety [J].
Howard, John ;
Murashov, Vladimir ;
Branche, Christine M. .
AMERICAN JOURNAL OF INDUSTRIAL MEDICINE, 2018, 61 (01) :3-10
[10]   A Fuzzy Delphi-Analytical Hierarchy Process Approach for Ranking of Effective Material Selection Criteria [J].
Kazemi, Sajad ;
Homayouni, Seyed Mahdi ;
Jahangiri, Jay .
ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2015, 2015