An analysis of a structured benchmarking project The case of Dubai Electricity and Water Authority's benchmarking project

被引:3
作者
Al Nuseirat, Ahmad Abdullah [1 ]
El Kahlout, Zeyad Mohammad [1 ]
Abbas, Ahmed [2 ]
Adebanjo, Dotun [3 ]
Punnakitikashem, Prattana [4 ]
Mann, Robin [2 ]
机构
[1] Off Execut Council, Dubai Govt Excellence Program, Dubai, U Arab Emirates
[2] Massey Univ, Ctr Org Excellence Res, Auckland, New Zealand
[3] Univ Greenwich, Sch Business, London, England
[4] Mahidol Univ, Coll Management, Bangkok, Thailand
关键词
Benchmarking; Dubai; DEWA; DGEP; TRADE benchmarking methodology; PERFORMANCE; IMPLEMENTATION; FRAMEWORK; IMPROVE; SME;
D O I
10.1108/BIJ-02-2018-0032
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to investigate a benchmarking project carried out by the Dubai Electricity and Water Authority (DEWA) as part of a structured benchmarking initiative. The project was based on the TRADE benchmarking methodology and this paper examines the tools, activities and outcomes that relate to each stage of the adopted methodology. Design/methodology/approach This study is based on case study methodology. Data were collected from various sources including analysis of project reports written by DEWA's benchmarking team reporting on their activities during the project. Data were also collected from four project presentations given at different stages of the project. In addition, the research team held three meetings with the DEWA benchmarking team at different stages of the benchmarking project. Findings The results show the key challenges and successes faced during each stage of the benchmarking project. It indicates the actions taken to overcome the challenges and the role played by internal and external stakeholders in facilitating the success of the benchmarking project. Originality/value Academic research has not adequately examined and analysed the stage-by-stage elements of a benchmarking project from the perspective of the implementing organisation. This study addresses this gap by detailing and analysing the experiences of a benchmarking project by tracking the stage-by-stage activities of the benchmarking team.
引用
收藏
页码:1431 / 1450
页数:20
相关论文
共 65 条
[41]   Benchmarking energy efficiency in drinking water treatment plants: Quantification of potential savings [J].
Molinos-Senante, Maria ;
Guzman, Catalina .
JOURNAL OF CLEANER PRODUCTION, 2018, 176 :417-425
[42]   Customer satisfaction and statistical techniques for the implementation of benchmarking in the public sector [J].
Mugion, Roberta Guglielmetti ;
Musella, Flaminia .
TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2013, 24 (5-6) :619-640
[43]   Implementation of benchmarking concepts in Indian automobile industry - an empirical study [J].
Panwar, Avinash ;
Nepal, Bimal ;
Jain, Rakesh ;
Yadav, Om Prakash .
BENCHMARKING-AN INTERNATIONAL JOURNAL, 2013, 20 (06) :777-804
[44]  
Partovi F. Y., 1994, INT J OPER PROD MAN, V14, P25
[45]   Summer soil moisture regulated by precipitation frequency in China [J].
Piao, Shilong ;
Yin, Lei ;
Wang, Xuhui ;
Ciais, Philippe ;
Peng, Shushi ;
Shen, Zehao ;
Seneviratne, Sonia I. .
ENVIRONMENTAL RESEARCH LETTERS, 2009, 4 (04)
[46]   Two-step benchmarking: Setting more realistically achievable targets in DEA [J].
Ramon, Nuria ;
Ruiz, Jose L. ;
Sirvent, Inmaculada .
EXPERT SYSTEMS WITH APPLICATIONS, 2018, 92 :124-131
[47]   Benchmarking in public procurement [J].
Raymond, Jeanette .
BENCHMARKING-AN INTERNATIONAL JOURNAL, 2008, 15 (06) :782-793
[48]   A benchmarking framework for eTourism capability of destinations' industries [J].
Reino, Sofia ;
Frew, Andrew J. ;
Mitsche, Nicole .
JOURNAL OF HOSPITALITY AND TOURISM TECHNOLOGY, 2014, 5 (02) :126-142
[49]   Benchmarking contract management process maturity: a case study of the US Navy [J].
Rendon, Rene G. .
BENCHMARKING-AN INTERNATIONAL JOURNAL, 2015, 22 (07) :1481-1508
[50]   A Method for Internal Benchmarking of Criminal Justice System Performance [J].
Ridgeway, Greg ;
MacDonald, John M. .
CRIME & DELINQUENCY, 2014, 60 (01) :145-162