Copper price estimation using bat algorithm

被引:67
作者
Dehghani, Hesam [1 ]
Bogdanovic, Dejan [2 ]
机构
[1] Hamedan Univ Technol, Min Engn Fac, Hamadan, Iran
[2] Univ Belgrade, Tech Fac, Belgrade, Serbia
关键词
Copper price; Bat algorithm; Time series; Estimation; NEURAL-NETWORKS; METAL PRICES; TREE;
D O I
10.1016/j.resourpol.2017.10.015
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The most effective parameter on the value of mining projects is metal price volatility. Therefore, knowing the metal price volatility can help the managers and shareholders of the mining projects to make the right decisions for extending or restricting the mining activities. Nowadays, classical estimation methods cannot correctly estimate the metal prices volatility due to their frequent variations in the past years. For solving this problem, it is necessary to use the artificial algorithms that have a good ability to predict the volatility of the various phenomena. In this paper, the Bat algorithm was used to predict the copper price volatility. Accordingly, Brownian motion with mean reversion (BMMR) was chosen as the most suitable time series function with the root mean square error (RMSE) of 0.449. Then, the estimation parameters of the equation were modified using Bat algorithm. Finally, it is concluded that the determined equation with 0.132 of RMSE can predict the copper price better than the classic estimation methods.
引用
收藏
页码:55 / 61
页数:7
相关论文
共 26 条
[1]  
Chandar SK, 2016, INT J COMPUT COMMUN, V11, P372
[2]   Multi-step-ahead Crude Oil Price Forecasting based on Grey Wave Forecasting Method [J].
Chen, Yanhui ;
Zou, Yingchao ;
Zhou, Yuzhen ;
Zhang, Chuan .
PROMOTING BUSINESS ANALYTICS AND QUANTITATIVE MANAGEMENT OF TECHNOLOGY: 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT (ITQM 2016), 2016, 91 :1050-1056
[3]   A novel grey wave forecasting method for predicting metal prices [J].
Chen, Yanhui ;
He, Kaijian ;
Zhang, Chuan .
RESOURCES POLICY, 2016, 49 :323-331
[4]   Evaluation of the mining projects under economic uncertainties using multidimensional binomial tree [J].
Dehghani, Hesam ;
Ataee-pour, Majid ;
Esfahanipour, Akbar .
RESOURCES POLICY, 2014, 39 :124-133
[5]   Determination of the effect of operating cost uncertainty on mining project evaluation [J].
Dehghani, Hesam ;
Ataee-pour, Majid .
RESOURCES POLICY, 2012, 37 (01) :109-117
[6]  
Feng Y., 2009, CONTROL AUTOM IEEE
[7]  
Fenton M., 2004, BAT ECHOLOCATION RES, P2
[8]  
Guha B., 2016, J ADV MANAG SCI, V4, P117
[9]  
Hadavandi E., 2010, Proceedings of the Third International Conference on Business Intelligence and Financial Engineering (BIFE 2010), P337, DOI 10.1109/BIFE.2010.85
[10]  
Huang Guang-qiu, 2013, Application Research of Computers, V30, P1323, DOI 10.3969/j.issn.1001-3695.2013.05.011