A Study on Public Construction Project Duration Risk Identification and Evaluation

被引:0
|
作者
Lu, Fuzhou [1 ]
Zhou, Yan [1 ]
Shang, Jingyu [1 ]
机构
[1] Xian Univ Architecture & Technol, Xian, Shanxi, Peoples R China
关键词
Schedule Risk; Risk Identification; Risk Assessment; System Dynamics;
D O I
10.4028/www.scientific.net/AMM.457-458.1593
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
According to the intricate dynamic relationship of the duration management system, the paper identified risk factors for the object.Then established a comprehensive integrated Public Construction Project duration risk assessment model with the application of game theory-based weighting method. The model is validated effective and reasonable through simulation analysis. And it also provides a new way of thinking in the duration risk assessment. Public Construction Project is the infrastructure construction project which is closely related to people's lives and invested by the government.As the implementation of a large number of Public Construction Project, the effectiveness of project management method has been highlighted as the bottleneck of the project construction.In-[1] the process of management, the theory research especially the delay discipline is very limited.([2]) The existing theory research results have important guiding significance to the analysis of the article. However, the traditional identification method of schedule risk focused on the research of problems related to the project, and did not consider the whole project as a system.([3])Due to the dynamics and complexity characteristics of schedule management, the traditional analysis method have some limitations in the risk identification. Inappropriate recognition method not only can't reflect the systematic characteristics of schedule management, it is also hard to keep the project from risk totally. From the perspective of system thinking. On the one hand, using the method of system dynamics to bring risk factors into the schedule management system. Take the feedback, control theory to analyze the interaction between factors to identify the main elements that influence the schedule management system; On the other hand, based on the identified main factors adopt the appropriate risk assessment method to sort the influence degree.
引用
收藏
页码:1593 / 1596
页数:4
相关论文
共 50 条
  • [31] Dynamic fuzzy evaluation of construction project risk based on collaboration
    Gao, Yun-Li
    Li, Hong-Nan
    Zhang, Guo-Jun
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (03): : 404 - 408
  • [32] Risk evaluation and control of EPC hydropower construction project in Vietnam
    Mai Sy Hung
    Qiong, Wang Jian
    Vu Hong Anh
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 206 - 215
  • [33] Discussion on investment risk evaluation method for petroleum construction project
    Zhu, Wei
    Liu, Yichao
    Tianranqi Gongye/Natural Gas Industry, 2000, 20 (06): : 99 - 102
  • [34] A Fuzzy Evaluation Method of Construction Project Risk Based on Cooperation
    Gao, Yunli
    Wang, Qingchun
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2802 - 2805
  • [35] Study on the Construction of Three-dimensional Risk Identification Model of Public Service Outsourcing in China
    Zhang Zhen
    Zhu Xiao-ning
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (9TH), VOL I, 2013, : 307 - 313
  • [36] Study on Project Duration Risk Based on Unascertained-PERT
    Ma Lihua
    Wang Aifeng
    Yan Aifeng
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2109 - 2112
  • [37] A comparative study of bureaucracy in public and private construction project organizations
    Liu, AMM
    Lam, BC
    PROCEEDINGS OF CRIOCM 2005 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2005, : 521 - 529
  • [38] Study on the Construction of Efficiency Evaluation System of Urban Ecological Construction Project
    Song, Tianmei
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON EDUCATION, SPORTS, ARTS AND MANAGEMENT ENGINEERING (ICESAME 2017), 2017, 123 : 281 - 285
  • [39] Risk index identification of UHV power transmission construction project in China
    Zhao, Huiru
    Guo, Sen
    Zhang, Jinfang
    Fan, Yaowen
    ICIC Express Letters, 2014, 8 (10): : 2927 - 2932
  • [40] Risk analysis method for project duration of highways during construction period and its application
    Han, Shang-Yu
    Li, Hong
    Hong, Bao-Ning
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (SUPPL.1): : 264 - 268