共 50 条
- [31] Dynamic fuzzy evaluation of construction project risk based on collaboration Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (03): : 404 - 408
- [32] Risk evaluation and control of EPC hydropower construction project in Vietnam PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 206 - 215
- [33] Discussion on investment risk evaluation method for petroleum construction project Tianranqi Gongye/Natural Gas Industry, 2000, 20 (06): : 99 - 102
- [34] A Fuzzy Evaluation Method of Construction Project Risk Based on Cooperation ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2802 - 2805
- [35] Study on the Construction of Three-dimensional Risk Identification Model of Public Service Outsourcing in China PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (9TH), VOL I, 2013, : 307 - 313
- [36] Study on Project Duration Risk Based on Unascertained-PERT PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2109 - 2112
- [37] A comparative study of bureaucracy in public and private construction project organizations PROCEEDINGS OF CRIOCM 2005 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2005, : 521 - 529
- [38] Study on the Construction of Efficiency Evaluation System of Urban Ecological Construction Project PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON EDUCATION, SPORTS, ARTS AND MANAGEMENT ENGINEERING (ICESAME 2017), 2017, 123 : 281 - 285
- [39] Risk index identification of UHV power transmission construction project in China ICIC Express Letters, 2014, 8 (10): : 2927 - 2932
- [40] Risk analysis method for project duration of highways during construction period and its application Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (SUPPL.1): : 264 - 268