A Study on Public Construction Project Duration Risk Identification and Evaluation

被引:0
|
作者
Lu, Fuzhou [1 ]
Zhou, Yan [1 ]
Shang, Jingyu [1 ]
机构
[1] Xian Univ Architecture & Technol, Xian, Shanxi, Peoples R China
关键词
Schedule Risk; Risk Identification; Risk Assessment; System Dynamics;
D O I
10.4028/www.scientific.net/AMM.457-458.1593
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
According to the intricate dynamic relationship of the duration management system, the paper identified risk factors for the object.Then established a comprehensive integrated Public Construction Project duration risk assessment model with the application of game theory-based weighting method. The model is validated effective and reasonable through simulation analysis. And it also provides a new way of thinking in the duration risk assessment. Public Construction Project is the infrastructure construction project which is closely related to people's lives and invested by the government.As the implementation of a large number of Public Construction Project, the effectiveness of project management method has been highlighted as the bottleneck of the project construction.In-[1] the process of management, the theory research especially the delay discipline is very limited.([2]) The existing theory research results have important guiding significance to the analysis of the article. However, the traditional identification method of schedule risk focused on the research of problems related to the project, and did not consider the whole project as a system.([3])Due to the dynamics and complexity characteristics of schedule management, the traditional analysis method have some limitations in the risk identification. Inappropriate recognition method not only can't reflect the systematic characteristics of schedule management, it is also hard to keep the project from risk totally. From the perspective of system thinking. On the one hand, using the method of system dynamics to bring risk factors into the schedule management system. Take the feedback, control theory to analyze the interaction between factors to identify the main elements that influence the schedule management system; On the other hand, based on the identified main factors adopt the appropriate risk assessment method to sort the influence degree.
引用
收藏
页码:1593 / 1596
页数:4
相关论文
共 50 条
  • [1] Study on the optimization of Public Construction project duration
    Luo, Fuzhou
    Shang, Jingyu
    Zhou, Yan
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1589 - 1592
  • [2] Project risk simulation under uncertain construction duration
    Hsu, KJ
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1277 - 1282
  • [3] Applying Risk Management Workshop for a Public Construction Project: Case Study
    Goh, Cheng Siew
    Abdul-Rahman, Hamzah
    Samad, Zulkiflee Abdul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (05) : 572 - 580
  • [4] Environmental Risk Identification of Port Construction Project
    Zheng, Lina
    Zhao, Baoxiu
    Wang, Hong
    Liu, Hengming
    2011 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND INFORMATION APPLICATION TECHNOLOGY ESIAT 2011, VOL 10, PT C, 2011, 10 : 2783 - 2787
  • [5] Risk Identification and Prevention of International Construction Project
    Tang, Xin-fa
    Tao, Jing
    INTERNATIONAL CONFERENCE ON INFORMATION, COMPUTER AND EDUCATION ENGINEERING (ICICEE 2017), 2017, : 560 - 566
  • [6] Synthetic Evaluation on Decision of Public Bidding for Construction Project
    孙涛
    颜秋许
    Journal of China University of Mining & Technology, 2002, (01) : 49 - 52+57
  • [7] Construction risk matrix aids in project evaluation
    Private Power Executive, 1995, 3 (01):
  • [8] The Risk Analysis and Evaluation of Project Construction Cost
    Cao, Duna
    Zhu, Binmei
    2011 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION AND INDUSTRIAL APPLICATION (ICIA2011), VOL II, 2011, : 212 - 215
  • [9] Construction project risk evaluation based on FMEA
    Wang, Ru
    Feng, Youliang
    Yang, Hongmei
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [10] The Risk Analysis and Evaluation of Project Construction Cost
    Cao, Duna
    Zhu, Binmei
    2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL VII, 2010, : 213 - 216