Unit commitment problem solution using invasive weed optimization algorithm

被引:66
作者
Saravanan, B. [1 ]
Vasudevan, E. R. [1 ]
Kothari, D. P. [2 ]
机构
[1] Vellore Inst Technol Univ, Vellore, Tamil Nadu, India
[2] MVSR Engn Coll, Hyderabad, Andhra Pradesh, India
关键词
Unit commitment; Evolutionary programming; Economic dispatch; IWO; Seeds; Fitness;
D O I
10.1016/j.ijepes.2013.08.020
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The evolutionary algorithm of invasive weed optimization algorithm popularly known as the IWO has been used in this paper, to solve the unit commitment (UC) problem. This integer coded algorithm is based on the colonizing behavior of weed plants and has been developed to minimize the total generation cost over a scheduled time period while adhering to several constraints such as generation limits, meeting load demand, spinning reserves and minimum up and down time. The minimum up/down time constraints have been coded in a direct manner without using the penalty function method. The proposed algorithm was tested and validated using 10 units and 24 h system. The most important merit of the proposed methodology is high accuracy and good convergence speed as it is a derivative free algorithm. The simulation results of the proposed algorithm have been compared with the results of other tested algorithms for UC such as shuffled frog leaping, particle swarm optimization, genetic algorithm and Lagrangian relaxation and bacterial foraging algorithm. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:21 / 28
页数:8
相关论文
共 22 条
[1]   State estimation of nonlinear stochastic systems using a novel meta-heuristic particle filter [J].
Ahmadi, Mohamadreza ;
Mojallali, Hamed ;
Izadi-Zamanabadi, Roozbeh .
SWARM AND EVOLUTIONARY COMPUTATION, 2012, 4 :44-53
[2]  
Alvarez Lopez Juan, 2013, INT J ELEC POWER, V49, P287
[3]  
[Anonymous], 1984, Power Generation Operation and Control
[4]   Unit Commitment Problem Solution Using Shuffled Frog Leaping Algorithm [J].
Ebrahimi, Javad ;
Hosseinian, Seyed Hossein ;
Gharehpetian, Gevorg B. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (02) :573-581
[5]   A novel method for maintenance scheduling of generating units considering the demand side [J].
Elyas, Seyyed Hamid ;
Foroud, Asghar Akbari ;
Chitsaz, Hamed .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 51 :201-212
[6]   Bacterial Foraging-Based Solution to the Unit-Commitment Problem [J].
Eslamian, Morteza ;
Hosseinian, Seyed Hossein ;
Vahidi, Behrooz .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (03) :1478-1488
[7]  
German Morales-Espana, 2013, IEEE T POWER SYST
[8]   Economic load dispatch using θ-PSO [J].
Hosseinnezhad, Vahid ;
Babaei, Ebrahim .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 49 :160-169
[9]   Invasive Weed Optimization and its Features in Electromagnetics [J].
Karimkashi, Shaya ;
Kishk, Ahmed A. .
IEEE TRANSACTIONS ON ANTENNAS AND PROPAGATION, 2010, 58 (04) :1269-1278
[10]   A genetic algorithm solution to the unit commitment problem [J].
Kazarlis, SA ;
Bakirtzis, AG ;
Petridis, V .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :83-90