Lot scheduling on a single machine to minimize the (weighted) number of tardy orders

被引:6
|
作者
Mor, Baruch [1 ]
Mosheiov, Gur [2 ]
Shapira, Dana [3 ]
机构
[1] Ariel Univ, Dept Econ & Business Adm, IL-40700 Ariel, Israel
[2] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
[3] Ariel Univ, Dept Comp Sci, IL-40700 Ariel, Israel
基金
以色列科学基金会;
关键词
Scheduling; Lot scheduling; Single machine; Number of tardy orders; Dynamic programming;
D O I
10.1016/j.ipl.2020.106009
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider a single machine lot scheduling problem. A number of customer orders of different sizes may be processed in the same lot. We consider first the setting that splitting orders between consecutive lots is allowed. We focus on minimizing the number of tardy orders. A polynomial time solution algorithm is introduced for this problem. We then study the extension to minimizing the weighted number of tardy orders. This problem is NP-hard, and a pseudo-polynomial dynamic programming is provided and tested. We also study the setting of no-split. The problem of minimizing the number of tardy orders in this context is proved to be strongly NP-hard, and an efficient heuristic is introduced. (C) 2020 Elsevier B.V. All rights reserved.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Single machine scheduling with maximum earliness and number tardy
    Azizoglu, M
    Kondakci, S
    Köksalan, M
    COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (02) : 257 - 268
  • [22] Concurrent open shop scheduling to minimize the weighted number of tardy jobs
    Ng, CT
    Cheng, TCE
    Yuan, JJ
    JOURNAL OF SCHEDULING, 2003, 6 (04) : 405 - 412
  • [23] Pareto-scheduling with double-weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
    Guo, Shuen
    Lu, Lingfa
    Yuan, Jinjiang
    Ng, Chi To
    Cheng, Tai Chiu Edwin
    NAVAL RESEARCH LOGISTICS, 2022, 69 (05) : 816 - 837
  • [24] Concurrent Open Shop Scheduling to Minimize the Weighted Number of Tardy Jobs
    C. T. Ng
    T. C. E. Cheng
    J. J. Yuan
    Journal of Scheduling, 2003, 6 : 405 - 412
  • [25] Preemptive scheduling to minimize total weighted late work and weighted number of tardy jobs
    Chen, Rubing
    He, Ruyan
    Yuan, Jinjiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 167
  • [26] Data-driven Single Machine Scheduling Minimizing Weighted Number of Tardy Jobs
    Antonov, Nikolai
    Sucha, Premysl
    Janota, Mikolas
    PROGRESS IN ARTIFICIAL INTELLIGENCE, EPIA 2023, PT I, 2023, 14115 : 483 - 494
  • [27] Minimizing the weighted number of tardy jobs on a single machine
    M'Hallah, R
    Bulfin, RL
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 145 (01) : 45 - 56
  • [28] A Stronger Complexity Result for the Single Machine Multi-Operation Jobs Scheduling Problem to Minimize the Number of Tardy Jobs
    T. C. E. Cheng
    C. T. Ng
    J. J. Yuan
    Journal of Scheduling, 2003, 6 : 551 - 555
  • [29] Lot scheduling on a single machine
    Hou, Yung-Tsung
    Yang, Dar-Li
    Kuo, Wen-Hung
    INFORMATION PROCESSING LETTERS, 2014, 114 (12) : 718 - 722
  • [30] A stronger complexity result for the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobs
    Cheng, TCE
    Ng, CT
    Yuan, JJ
    JOURNAL OF SCHEDULING, 2003, 6 (06) : 551 - 555