Two-machine flowshop scheduling to minimize total completion time with separate setup and removal times

被引:0
作者
Allahverdi, A [1 ]
Aldowaisan, T [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Ind & Management Syst Engn, Safat, Kuwait
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2002年 / 9卷 / 03期
关键词
two-machine flowshop; setup time; removal time; total completion time;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the two-machine flowshop problem with respect to the total completion time performance measure, where setup and removal times are considered as separate from processing times. Optimal solutions are obtained for certain flowshops, and dominance relations are developed for the general problem. A lower bound is established and efficient heuristic algorithms are proposed. The heuristic algorithms and dominance relations are empirically evaluated to assess their effectiveness. Empirical evaluation shows that the dominance relations are quite useful, and that the heuristic algorithms have small error that is independent of the number of jobs.
引用
收藏
页码:275 / 286
页数:12