Critical path method-line of balance model for efficient scheduling of repetitive construction projects

被引:0
作者
Hegazy, T [1 ]
机构
[1] Univ Waterloo, Dept Civil Engn, Waterloo, ON N2L 3G1, Canada
来源
CONSTRUCTION 2001: MATERIALS AND CONSTRUCTION | 2001年 / 1761期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A general model is presented for efficient scheduling and resource management in construction projects that involve a high degree of repetition, such as highways and pipelines. The proposed model has three main features: (a) it fully integrates the critical path method for network analysis and the line of balance technique for linear scheduling, (b) it allows realistic schedule development considering project deadline and resource constraints, and (c) it incorporates improved schedule presentation that shows crews' movements along the repetitive units and their detailed work assignments. The detailed formulation of the proposed model is described, and an example application is presented. The proposed model is demonstrated to offer significant advantages as a resource-driven approach. Future extensions to the proposed model are then outlined.
引用
收藏
页码:124 / 129
页数:6
相关论文
共 5 条
  • [1] JOHNSTON DW, 1981, J CONSTRUCT DIV-ASCE, V107, P247
  • [2] LUMSDEN P, 1986, LINE BALANCE METHOD
  • [3] OBRIEN JJ, 1975, J CONSTRUCT DIV-ASCE, V101, P895
  • [4] STRADAL O, 1982, J CONSTRUCT DIV-ASCE, V108, P445
  • [5] CPM/LOB - NEW METHODOLOGY TO INTEGRATE CPM AND LINE OF BALANCE
    SUHAIL, SA
    NEALE, RH
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (03): : 667 - 684