FPA method for optimal production planning under availability/degradation machine and subcontracting constraint

被引:9
作者
Ayed, Souheil [1 ]
Hajej, Zied [2 ,3 ]
Turki, Sadok [2 ,3 ]
Rezg, Nidhal [2 ,3 ]
机构
[1] Higher Sch Sci & Techn Tunis, Prod Engn Res Ctr, Tunis, Tunisia
[2] Lorraine Univ, Ind Engn & Prod Lab Maintenance, Metz, France
[3] ICN Business Sch, Metz, France
关键词
preventive maintenance; subcontraction; discrete flow model; finite perturbation analysis; production planning; degradation; PERTURBATION ANALYSIS; PREVENTIVE MAINTENANCE; MANUFACTURING SYSTEMS; OPTIMIZATION; DESIGN; LEVEL;
D O I
10.1080/00207543.2016.1165879
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work treats an industrial problematic of a manufacturing system M-1 subject to random failure and that satisfies a random demand under required service level. To ensure the satisfaction of the demand, it calls up on a second manufacturing system M-2 that is a subcontractor and has a stochastic service level. This paper aims to determine an optimal production plan taking into account the degradation of the manufacturing system following its production rate and its availability. The unavailability of the machine M-1 is due to the non-negligible preventive and corrective maintenance actions duration. To consider a realistic case of the subcontractor, we consider that is not able to respond to the variation of the demand, and then it assumed that the manufacturer can order a minimum fixed quantity. We then derive an optimal production plan taking into account the degradation of the machine and simultaneously minimising: inventory, degradation and production cost. An algorithm based on finite perturbation analysis is proposed to determine the optimal production plan and the sensitivity study of the availability is presented.
引用
收藏
页码:2135 / 2148
页数:14
相关论文
共 28 条
[1]  
[Anonymous], 2014, 11 IEEE INT C NETW S
[2]   Joint optimisation of maintenance and production policies considering random demand and variable production rate [J].
Ayed, Souheil ;
Sofiene, Dellagi ;
Nidhal, Rezg .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (23) :6870-6885
[3]  
Buzacott J.A., 1967, International Journal of Production Research, V5, P183, DOI [10.1080/00207546708929751, DOI 10.1080/00207546708929751]
[4]   Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance [J].
Chelbi, A ;
Alt-Kadi, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :712-718
[5]  
Filho O. S. S., 2007, P AM CONTR C
[6]  
Finch B., 1986, Journal of Operations Management, V6, P449
[7]   Maintenance scheduling and production control of multiple-machine manufacturing systems [J].
Gharbi, A ;
Kenné, JP .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (04) :693-707
[8]   Production and preventive maintenance rates control for a manufacturing system: An experimental design approach [J].
Gharbi, A ;
Kenne, JP .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 65 (03) :275-287
[9]   Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns [J].
Hajej, Zied ;
Turki, Sadok ;
Rezg, Nidhal .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (15) :4694-4719
[10]  
Holt C. C., 1960, INT SERIES MANAGEMEN