Open pit mine planning considering geomechanical fundamentals

被引:10
作者
Parra, Andres [1 ,2 ,3 ]
Morales, Nelson [1 ,2 ,3 ]
Vallejos, Javier [2 ,3 ]
Phu Minh Vuong Nguyen [1 ,2 ,3 ]
机构
[1] Univ Chile, Delphos Mine Planning Lab, Santiago, Chile
[2] Univ Chile, Min Engn Dept, Santiago, Chile
[3] Univ Chile, Adv Min Technol Ctr, Santiago, Chile
关键词
Open pit mine planning; slope design; slope stability; factor of safety; open pit mine designs;
D O I
10.1080/17480930.2017.1278579
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The objective of this study is to integrate the admissible factor of safety (FoS) into the mine planning. The analysis showed, as expected, that a lower net present value (NPV) is obtained with the increase in the admissible FoS. Most importantly, it demonstrated that the FoS of the slopes of the adjacent phases, which are not part of the final pit, are considerably greater than the admissible FoS. Therefore, the NPV of an open pit mine project can be increased by steepening the slopes of adjacent phases that are not part of the final pit walls.
引用
收藏
页码:221 / 238
页数:18
相关论文
共 34 条
  • [1] Abramson L.W., 1996, Slope stability and stabilization methods, V1st
  • [2] [Anonymous], 1995, SUPPORT UNDERGROUND
  • [3] [Anonymous], 2003, LULEA U TECHNOLOGY
  • [4] [Anonymous], 2013, PICTURED LARGEST N A
  • [5] [Anonymous], 1992, P ROCK CHAR S ISRM S
  • [6] [Anonymous], 2009, THESIS U NEW S WALES
  • [7] Bienawski Z.T., 1976, P S EXPLORATION ROCK, P97, DOI DOI 10.1016/0148-9062(77)90608-8
  • [8] Bieniawski Z.T., 1989, ENG ROCK MASS CLASSI
  • [9] Bieniawski Z.T., 1979, PROC 4 INT C ROCK ME, V2, P41
  • [10] Sizing equipment for open pit mining - a review of critical parameters
    Bozorgebrahimi, E
    Hall, RA
    Blackwell, GH
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2003, 112 : 171 - 179