Construction Information Management for the General Contractor of the National Stadium Project

被引:0
作者
Li Jiulin [1 ]
Zhang Jianping
Ma Zhiliang
Wang Dayong [1 ]
Lu Wei [1 ]
机构
[1] Beijing Urban Construct Grp Co Ltd, Beijing 100088, Peoples R China
来源
PROCEEDINGS OF SHANGHAI INTERNATIONAL CONFERENCE ON TECHNOLOGY OF ARCHITECTURE AND STRUCTURE, PT II | 2009年
关键词
national stadium; bird' s nest; construction; information management;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The National Stadium (nicknamed Bird's Nest), which was the main stadium for the 2008 Olympic Games, was a large-scale complex project featuring innovative architecture design and complex structure, using lots of high technologies. Because of its tight construction schedule, it was necessary to adopt information technologies to coordinate and manage various aspects such as duration, safety, quality, cost etc. By applying comprehensively an information management system, a collaborative platform, a 4D construction management system and a video surveillance system, the management was enhanced to ensure the smooth construction of the project.
引用
收藏
页码:24 / 31
页数:8
相关论文
共 4 条
[1]  
LU JL, 2005, NATL STADIUM CONSTRU
[2]  
MA ZL, 2006, P 2 INT C DIG CIT SU
[3]   Mn1.5Co1.5O4 spinel protection layers on ferritic stainless steels for SOFC interconnect applications [J].
Yang, ZG ;
Xia, GG ;
Stevenson, JW .
ELECTROCHEMICAL AND SOLID STATE LETTERS, 2005, 8 (03) :A168-A170
[4]  
ZHANG JP, 2006, P 1 INT CONSTR SPEC