Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum

被引:15
作者
Guo, Xinping [1 ]
Jiang, Annan [1 ]
Wang, Shanyong [2 ]
机构
[1] Dalian Maritime Univ, Highway & Bridge Inst, Dalian 116026, Peoples R China
[2] Univ Newcastle, ARC Ctr Excellence Geotech Sci & Engn, Newcastle, NSW 2308, Australia
基金
中国国家自然科学基金;
关键词
SURFACE SETTLEMENT; DEEP EXCAVATION;
D O I
10.1155/2021/6615016
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The main challenge for metro station construction is to ensure the construction schedule while minimizing the impact on the surrounding environment. Based on the characteristics of the upper-soft and lower-hard stratum in the Dalian city of China, a special structure with six pilot tunnels and three spans of the pile-beam-arch (PBA) method is proposed and applied to the construction of the Labor Park metro station. In this study, laboratory experiments, numerical simulation analysis, and field monitoring data are used to investigate the applicability of six pilot tunnels and three spans of the PBA method in the process of construction. In the process of numerical simulation, the ground surface settlement, arch vertical displacement, the horizontal displacement of rock mass on both sides of the station, and vertical stress of support structure are analyzed. The numerical simulation results are found to be in good agreement with field measurement. Furthermore, the results indicate that, in the construction of six pilot tunnels and three spans of the PBA method, pilot tunnel construction and arch construction have a great influence on the surface settlement. The part of the initial vertical support of the pilot tunnels is removed, which caused the change of the position of maximum vertical stress and the redistribution of vertical stress. Because of reinforcement by side piles on both sides of the station, the horizontal displacement of the rock mass was reduced by 44.76% compared with that without reinforcement. The six pilot tunnels and three spans of the PBA method can effectively control the surface settlement, arch vertical displacement, and horizontal displacement of the rock mass.
引用
收藏
页数:13
相关论文
共 23 条
[1]  
Chen Q. Z., 2017, RAILWAY ENG, V57, P81
[2]  
Chen X., 2006, J. Min. Saf. Eng, V23, P341
[3]   Effect of the lateral earth pressure coefficient on settlements during mechanized tunneling [J].
Golpasand, Mohammad-Reza B. ;
Do, Ngoc Anh ;
Dias, Daniel ;
Nikudel, Mohammad-Reza .
GEOMECHANICS AND ENGINEERING, 2018, 16 (06) :643-654
[4]   Three-dimensional numerical analysis of deep excavations with cross walls [J].
Hsieh, Pio-Go ;
Ou, Chang-Yu ;
Lin, Yi-Lang .
ACTA GEOTECHNICA, 2013, 8 (01) :33-48
[5]   Three-dimensional effects of a deep excavation on wall deflections in loose to medium dense sands [J].
Hsiung, Bi-Chen Benson ;
Yang, Kuo-Hsin ;
Aila, Wahyuning ;
Hung, Ching .
COMPUTERS AND GEOTECHNICS, 2016, 80 :138-151
[6]  
Jiang XL, 2011, ROCK SOIL MECH, V32, P1186
[7]   Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure [J].
Kivi, A. Valizadeh ;
Sadaghiani, M. H. ;
Ahmadi, M. M. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 28 :1-9
[8]   Deformations during cut-and-cover construction of MUNI Metro Turnback project [J].
Koutsoftas, DC ;
Frobenius, P ;
Wu, CL ;
Meyersohn, D ;
Kulesza, R .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2000, 126 (04) :344-359
[9]   Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method [J].
Li, B. ;
Wang, Z. Z. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 88 :209-220
[10]   Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method [J].
Liu, Xinrong ;
Liu, Yongquan ;
Yang, Zhongping ;
He, Chunmei .
KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (05) :1690-1705