Field monitoring study of an integral abutment bridge supported by prestressed precast concrete piles on soft soils

被引:8
|
作者
Kong, B. [1 ]
Cai, C. S. [1 ]
Kong, X. [1 ]
机构
[1] Louisiana State Univ, Dept Civil & Environm Engn, Baton Rouge, LA 70803 USA
关键词
Integral bridge; Field monitoring; Thermal performance; Slab strain; Backfill pressure; BEHAVIOR;
D O I
10.1016/j.engstruct.2015.09.004
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integral abutment bridges (IABs) have been constructed during the past several decades around the world. The purpose was to eliminate expansion joints and minimize joints induced problems. Even though IABs have been widely accepted due to the satisfying performances, yet they have not been largely applied in practice. Some of the reasons may be attributed to the uncertainties of these bridges under different loading conditions, especially the daily and yearly varying temperature effects. In this paper, the behavior of the first IAB constructed on the soft soil condition in Louisiana is discussed. A field monitoring program is introduced and the measured results from 08/11/2011 to 03/15/2014 are presented. The field monitoring program leads to the following observations, (1) significant seasonal and daily temperature variations are observed on the bridge slabs but within the AASHTO temperature design specification; (2) the displacements and rotations of bridge components are well correlated with the temperature variations; (3) the thermal stresses generated in the slabs may exceed the allowable material cracking capacity; (4) the soil behavior behind the abutments is complicated and long term monitoring program is needed; (5) the integral abutment primarily behaves in translation rather than rotation; and (6) the pile inflection (zero bending) point is observed and the strong and weak axels bending are all important due to the bridge skewness. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:18 / 31
页数:14
相关论文
共 5 条
  • [1] Parametric study of an integral abutment bridge supported by prestressed precast concrete piles
    Kong, B.
    Cai, C. S.
    Zhang, Y.
    ENGINEERING STRUCTURES, 2016, 120 : 37 - 48
  • [2] Field monitoring study of temperature effect for prestressed concrete box-girder bridge
    Chen, Baoguo
    Zheng, Junjie
    Ding, Rui
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON HEALTH MONITORING OF STRUCTURE, MATERIALS AND ENVIRONMENT, VOLS 1 AND 2, 2007, : 613 - 620
  • [3] Seismic performance of precast bridge bents with prestressed piles and new pocket connection design: Experimental and numerical study
    Jiang, Xinyan
    Li, Jianzhong
    Liu, Pan
    Qu, Hongya
    Gao, Jianfeng
    Bao, Zehua
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2024, 183
  • [4] Trial design study on integral abutment bridge supported on UHPC-RC segmental pile
    Chen, G. D.
    Chen, B. C.
    Huang, F. Y.
    Zhuang, Y. Z.
    Tabatabai, H.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 2166 - 2172
  • [5] Field monitoring of positive moment continuity detail in a skewed prestressed concrete bulb-tee girder bridge
    Okeil, Ayman M.
    Hossain, Tanvir
    Cai, C. S.
    PCI JOURNAL, 2013, : 80 - 90