共 50 条
- [41] A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times Journal of Intelligent Manufacturing, 2011, 22 : 965 - 978
- [43] Flexible Job-shop Scheduling Problem with Sequence-dependent Setup Times using Genetic Algorithm PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 2 (ICEIS), 2016, : 47 - 53
- [48] An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (5-6): : 416 - 424
- [50] Single machine scheduling problems with sequence-dependent setup times and precedence delays Scientific Reports, 12