摘要
This paper examines scheduling in flexible flow lines with sequence-dependent setup times to minimize makespan. This type of manufacturing environment is found in industries such as printed circuit board and automobile manufacture. An integer program that incorporates these aspects of the problem is formulated and discussed. Because of the difficulty in solving the IP directly, several heuristics are developed, based on greedy methods, flow line methods, the Insertion Heuristic for the Traveling Salesman Problem and the Random Keys Genetic Algorithm. Problem data is generated in order to evaluate the heuristics. The characteristics are chosen to reflect those used by previous researchers. A lower bound has been created in order to evaluate the heuristics, and is itself evaluated. An application of the Random Keys Genetic Algorithm is found to be very effective for the problems examined. Conclusions are then drawn and areas for future research are identified. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:66 / 82
页数:17
相关论文
共 50 条
  • [1] Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
    Kia, H. R.
    Davoudpour, H.
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (14) : 4019 - 4042
  • [2] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    Journal of Scheduling, 2014, 17 : 353 - 370
  • [3] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370
  • [4] Scheduling flexible flow shops with sequence-dependent setup effects
    Liu, CY
    Chang, SC
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2000, 16 (04): : 408 - 419
  • [5] Scheduling flexible flow shops with sequence-dependent setup effect
    Liu, CY
    PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 1757 - 1762
  • [6] Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    Andres, Carlos
    Miralles, Cristobal
    Pastor, Rafael
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1212 - 1223
  • [7] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [8] Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops
    M. Zandieh
    Behrouz Dorri
    A. R. Khamseh
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 767 - 778
  • [9] Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops
    Zandieh, M.
    Dorri, Behrouz
    Khamseh, A. R.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (7-8): : 767 - 778
  • [10] Balancing and scheduling tasks in parallel assembly lines with sequence-dependent setup times
    Ozcan, Ugur
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 213 : 81 - 96