A two-stage stochastic programming model for scheduling replacements in sow farms

被引:14
作者
Rodriguez, Sara V. [2 ]
Albornoz, Victor M. [1 ,3 ]
Pla, Lluis M. [2 ]
机构
[1] Univ T, Dept Ind, Cnica Federico Santa Maria, Santiago, Chile
[2] Univ Lleida, Dept Matemat, Lleida 25001, Spain
[3] Univ Tecn Feder Santa Maria, Dept Ind, Santiago 6400, Chile
关键词
Replacement; Planning; Stochastic programming; Sow herd management; UNCERTAINTY; MANAGEMENT;
D O I
10.1007/s11750-009-0087-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a formulation and resolution of a two-stage stochastic linear programming model with recourse for sow farms producing piglets. The proposed model considers a medium-term planning horizon and specifically allows optimal replacement and schedule of purchases to be obtained for the first stage. This model takes into account sow herd dynamics, housing facilities, reproduction management, herd size with initial and final inventory of sows and uncertain parameters such as litter size, mortality and fertility rates. These last parameters are explicitly incorporated via a finite set of scenarios. The proposed model is solved by using the algebraic modelling software OPL Studio from ILOG, in combination with the solver CPLEX to solve the linear models resulting from different instances considered. The article also presents results obtained with previous deterministic models assessing the suitability of the stochastic approach. Finally, the conclusions drawn from the study including an outlook are presented.
引用
收藏
页码:171 / 189
页数:19
相关论文
共 20 条
[1]   Total allowable catch for managing squat lobster fishery using stochastic nonlinear programming [J].
Albornoz, VM ;
Canales, CA .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (08) :2113-2124
[2]  
ALONSOAYUSO A, 2005, APPL STOCHASTIC PROG
[3]  
[Anonymous], 1997, Introduction to stochastic programming
[4]  
BEALE EML, 1955, J ROY STAT SOC B, V17, P173
[5]   LINEAR PROGRAMMING UNDER UNCERTAINTY [J].
Dantzig, George B. .
MANAGEMENT SCIENCE, 1955, 1 (3-4) :197-206
[6]  
Escudero L. F., 1993, Annals of Operations Research, V43, P311
[7]   Managing demand uncertainty in supply chain planning [J].
Gupta, A ;
Maranas, CD .
COMPUTERS & CHEMICAL ENGINEERING, 2003, 27 (8-9) :1219-1227
[8]   STOCHASTIC DYNAMIC-PROGRAMMING TO SUPPORT SOW REPLACEMENT DECISIONS [J].
HUIRNE, RBM ;
DIJKHUIZEN, AA ;
VANBEEK, P ;
HENDRIKS, THB .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 67 (02) :161-171
[9]   DYNAMIC PROBABILISTIC MODELING OF REPRODUCTION AND REPLACEMENT MANAGEMENT IN SOW HERDS - GENERAL-ASPECTS AND MODEL DESCRIPTION [J].
JALVINGH, AW ;
DIJKHUIZEN, AA ;
VANARENDONK, JAM .
AGRICULTURAL SYSTEMS, 1992, 39 (02) :133-152
[10]   Programming models of farm supply response: The impact of specification errors [J].
Kingwell, R .
AGRICULTURAL SYSTEMS, 1996, 50 (03) :307-324