A column generation-based exact solution method for seru scheduling problems

被引:29
|
作者
Zhang, Zhe [1 ]
Gong, Xue [1 ]
Song, Xiaoling [1 ]
Yin, Yong [2 ]
Lev, Benjamin [3 ]
Chen, Jie [1 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Peoples R China
[2] Doshisha Univ, Grad Sch Business, Kamigyo Ku, Kyoto 6028580, Japan
[3] Drexel Univ, LeBow Coll Business, Decis Sci Dept, Philadelphia, PA 19104 USA
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2022年 / 108卷
关键词
Seru scheduling; Dantzig-Wolfe decomposition; Column generation; Branch-and-bound; LINE-CELL CONVERSION; BRANCH-AND-PRICE; NUMERICAL-ANALYSIS; ALGORITHM; DECOMPOSITION; MODELS;
D O I
10.1016/j.omega.2021.102581
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper attempts to address production scheduling problems in seru production systems (SPS), which is a new-type manufacturing system emanating from Japanese electronic assembly industry. As a typical parallel production system, SPS has high efficiency, good flexibility, and rapid responsiveness, which are achieved by reconfiguring serus, increasing, or decreasing workers to adjust the output in practical volatile markets. The seru scheduling problem in this paper is formulated as an integer programming (IP) model to minimize the total weighted completion time (TWCT). Then, by employing the Dantzig-Wolfe decomposition, the proposed IP model is reformulated into a set partitioning problem with a master problem and several subproblems. A branch-and-bound (B&B) algorithm is designed, and each node in a B&B tree is a linear relaxation problem (LRP) of the set partitioning problem. The LRP is solved by a column generation approach, in which each column is generated to represent a schedule of the seru in SPS based on solving the subproblems. Computational experiments are conducted, and the results indicate that the proposed column generation-based exact solution method is promising in solving the seru scheduling problem effectively.(c) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] An exact solution method for seru scheduling problems with multiple rate-modifying activities and learning effect
    Jiang, Yujing
    Zhang, Zhe
    Gong, Xue
    Yin, Yong
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (04) : 469 - 511
  • [2] Applied column generation-based approach to solve supply chain scheduling problems
    Chang, Yung-Chia
    Chang, Kuei-Hu
    Chang, Teng-Kai
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (13) : 4070 - 4086
  • [3] An Exact Column Generation-Based Algorithm for Bi-objective Vehicle Routing Problems
    Glize, Estele
    Jozefowiez, Nicolas
    Ngueveu, Sandra Ulrich
    COMBINATORIAL OPTIMIZATION, ISCO 2018, 2018, 10856 : 208 - 218
  • [4] A new formulation and a column generation-based heuristic for the multiple depot vehicle scheduling problem
    Kulkarni, Sarang
    Krishnamoorthy, Mohan
    Ranade, Abhiram
    Ernst, Andreas T.
    Patil, Rahul
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 118 : 457 - 487
  • [5] A Column Generation-based Crew Scheduling Optimization Method for Urban Rail Transit
    Xu Z.
    Du P.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (03): : 25 - 32
  • [6] A column generation-based heuristic for a rehabilitation patient scheduling and routing problem
    Xiao, Liyang
    Zhen, Lu
    Laporte, Gilbert
    Baldacci, Roberto
    Wang, Chenghao
    COMPUTERS & OPERATIONS RESEARCH, 2022, 148
  • [7] A nested partitioning-based solution method for seru scheduling problem with resource allocation
    Zhang, Zhe
    Izui, Kazuhiro
    Song, Xiaoling
    Yin, Yong
    Gong, Xue
    JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING, 2024, 9 (01) : 101 - 114
  • [8] Reformulation and exact solution method for seru scheduling problem with learning effect and job deterioration
    Zhang R.
    Zhang Z.
    Gong X.
    Yin Y.
    International Journal of Applied Decision Sciences, 2023, 16 (05) : 613 - 645
  • [9] An exact solution method for solving seru scheduling problems with past-sequence-dependent setup time and learning effect
    Jiang, Yujing
    Zhang, Zhe
    Gong, Xue
    Yin, Yong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [10] An exact solution method for seru scheduling problems considering past-sequence-dependent setup time and adjustment activities
    Zhang R.
    Zhang Z.
    Song X.
    Yin Y.
    International Journal of Applied Decision Sciences, 2024, 17 (02) : 156 - 181