Participation of Pumped Hydro Storage in Energy and Performance-Based Regulation Markets

被引:24
作者
Alharbi, Hisham [1 ,2 ]
Bhattacharya, Kankar [2 ]
机构
[1] Taif Univ, Dept Elect Engn, Coll Engn, At Taif 21974, Saudi Arabia
[2] Univ Waterloo, Dept Elect & Comp Engn, Waterloo, ON N2L 3G1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Regulation; Generators; Indexes; Electricity supply industry; Energy storage; Uncertainty; Mathematical model; Hydraulic short-circuit; pumped hydro energy storage; performance-based regulation; regulation mileage; strategic bidding; MPEC; JOINT ENERGY; SYSTEMS; IMPACT;
D O I
10.1109/TPWRS.2020.2998490
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper examines the non-strategic and strategic participation of a pumped hydro energy storage (PHES) facility in day-ahead energy and performance-based regulation (PBR), which includes regulation capacity and mileage markets. The PHES is modeled with the capability of operating in hydraulic short-circuit (HSC) mode with detailed representation of its operational constraints, and integrated with an energy-cum-PBR market clearing model. For its strategic participation, a bi-level market framework is proposed to determine the optimal offers and bids of the PHES that maximize its profit. The operation of PHES is modeled at the upper level, while the market clearing is modeled in the lower level problem. The bi-level problem is formulated as a mathematical program with equilibrium constraints (MPEC) model, which is linearized and solved as a mixed integer linear programming problem. Several case studies are carried out to demonstrate the impact of PHES non-strategic and strategic operations on market outcomes. Furthermore, stochastic case studies are conducted to determine the PHES strategies considering the uncertainty of the net demand and rivals price and quantity offers.
引用
收藏
页码:4307 / 4323
页数:17
相关论文
共 34 条
[1]  
[Anonymous], 2013, Complementarity modeling in energy markets
[2]  
[Anonymous], 2019, MARK PROT SPP INT MA
[3]  
[Anonymous], 2011, Frequency Regulation Compensation in the Organized Wholesale Power Markets, Order No. 755
[4]  
[Anonymous], 2018, ANC SERV
[5]   Impact of Energy Storage Systems on Electricity Market Equilibrium [J].
Awad, Ahmed S. A. ;
Fuller, J. David ;
El-Fouly, Tarek H. M. ;
Salama, Magdy M. A. .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2014, 5 (03) :875-885
[6]   Mid-Term Stochastic Scheduling of a Price-Maker Hydro Producer With Pumped Storage [J].
Baslis, Costas G. ;
Bakirtzis, Anastasios G. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (04) :1856-1865
[7]  
Brooks AE, 2019, ELECT J, V32, DOI DOI 10.1016/J.TEJ.2019.106668
[8]   Energy storage and transmission expansion planning: substitutes or complements? [J].
Bustos, Carlos ;
Sauma, Enzo ;
de la Torre, Sebastian ;
Aguado, Jose A. ;
Contreras, Javier ;
Pozo, David .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (08) :1738-1746
[9]  
Castillo E., 2001, Building and solving mathematical programming models in engineering and science
[10]   Economic effects of forecasting inaccuracies in the automatic frequency restoration service for the day-ahead energy and reserve scheduling of pumped storage plants [J].
Chazarra, Manuel ;
Perez-Diaz, Juan I. ;
Garcia-Gonzalez, Javier ;
Helseth, Arild .
ELECTRIC POWER SYSTEMS RESEARCH, 2019, 174