Integration of distributed generation for assessment of distribution system reliability considering power loss, voltage stability and voltage deviation

被引:25
作者
Dixit, Mukul [1 ]
Kundu, Prasanta [1 ]
Jariwala, Hitesh R. [1 ]
机构
[1] SV Natl Inst Technol, Dept Elect Engn, Surat 395007, Gujarat, India
来源
ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS | 2019年 / 10卷 / 02期
关键词
DG placement; Distribution network reliability; Modified Gbest-guided artificial bee colony algorithm; Power loss; Voltage deviation; DISTRIBUTION FEEDER RECONFIGURATION; OPTIMAL PLACEMENT; DISTRIBUTION NETWORK; ALGORITHM; ENHANCEMENT; ALLOCATION; DG; IMPROVEMENT; OPERATION; CAPACITOR;
D O I
10.1007/s12667-017-0248-6
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents a combined scheme for solving optimal distributed generation (DG) placement and reliability assessment problem of distribution network. This has been solved through meta-heuristic based novel Modified Gbest-guided artificial bee colony (MGABC) optimization algorithm for the purpose of power loss reduction, index of voltage stability (IVS) improvement and voltage level enhancement. In addition to that, it also identifies the optimal values of rate of failure and time of repair of various distribution lines for enhancement of distribution reliability. Therefore to achieve these proposed objectives, three multi-objective functions are formulated. First multi-objective function is formed by combining purchased active power cost from grid, power loss cost, DG installation cost, DG operation and maintenance (O&M) cost, reliability cost, IVS and total voltage deviation. Second objective function is reliability based cost function with the consideration of DG units and the third one is comprehensive multi-objective function associated with first and second objective functions for solving DG placement and reliability enhancement problem simultaneously. The proposed problem is demonstrated on 8-bus distribution system. Obtained numerical outcomes illustrate that, simultaneous solving DG placement problem and reliability enhancement problem leads to reduction of total operating cost, total voltage deviation, power loss and improvement in IVS significantly. Furthermore, the results obtained through MGABC optimization algorithm are compared to other intelligence technique for highlighting the capability and superiority of proposed methodology.
引用
收藏
页码:489 / 515
页数:27
相关论文
共 45 条
[41]   Optimal Placement and Sizing of Distributed Generation via an Improved Nondominated Sorting Genetic Algorithm II [J].
Sheng, Wanxing ;
Liu, Ke-Yan ;
Liu, Yuan ;
Meng, Xiaoli ;
Li, Yunhua .
IEEE TRANSACTIONS ON POWER DELIVERY, 2015, 30 (02) :569-578
[42]   Reliability-Constrained Optimum Placement of Reclosers and Distributed Generators in Distribution Networks Using an Ant Colony System Algorithm [J].
Wang, Lingfeng ;
Singh, Chanan .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2008, 38 (06) :757-764
[43]   Reliability benefit analysis of adding WTG to a distribution system [J].
Wang, P ;
Billinton, R .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2001, 16 (02) :134-139
[44]   Gbest-guided artificial bee colony algorithm for numerical function optimization [J].
Zhu, Guopu ;
Kwong, Sam .
APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (07) :3166-3173
[45]   An Analytical Approach for Reliability Evaluation of Distribution Systems Containing Dispatchable and Nondispatchable Renewable DG Units [J].
Zou, Kai ;
Agalgaonkar, Ashish P. ;
Muttaqi, Kashem M. ;
Perera, Sarath .
IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (06) :2657-2665