Analysis of Wind Turbine Aging through Operation Curves

被引:25
|
作者
Astolfi, Davide [1 ]
Byrne, Raymond [2 ]
Castellani, Francesco [1 ]
机构
[1] Univ Perugia, Dept Engn, Via G Duranti 93, I-06125 Perugia, Italy
[2] Dundalk Inst Technol, Ctr Renewables & Energy, Dublin Rd, Louth A91 V5XR, Ireland
关键词
wind energy; wind turbines; technical systems aging; performance analysis; PERFORMANCE DECLINE; RELIABILITY; MODELS; TIME;
D O I
10.3390/en13215623
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The worsening with age of technical systems performance is a matter of fact which is particularly timely to analyze for horizontal-axis wind turbines because they constitute a mature technology. On these grounds, the present study deals with the assessment of wind turbine performance decline with age. The selected test case is a Vestas V52 wind turbine, installed in 2005 at the Dundalk Institute of Technology campus in Ireland. Operation data from 2008 to 2019 have been used for this study. The general idea is analyzing the appropriate operation curves for each working region of the wind turbine: in Region 2 (wind speed between 5 and 9 m/s), the generator speed-power curve is studied, because the wind turbine operates at fixed pitch. In Region 2 12 (wind speed between 9 and 13 m/s), the generator speed is rated and the pitch control is relevant: therefore, the pitch angle-power curve is analyzed. Using a support vector regression for the operation curves of interest, it is observed that in Region 2, a progressive degradation occurs as regards the power extracted for given generator speed, and after ten years (from 2008 to 2018), the average production has diminished of the order of 8%. In Region 2 12, the performance decline with age is less regular and, after ten years of operation, the performance has diminished averagely of the 1.3%. The gearbox of the test case wind turbine was substituted with a brand new one at the end of 2018, and it results that the performance in Region 2 12 has considerably improved after the gearbox replacement (+3% in 2019 with respect to 2018, +1.7% with respect to 2008), while in Region 2, an improvement is observed (+1.9% in 2019 with respect to 2018) which does not compensate the ten-year period decline (-6.5% in 2019 with respect to 2008). Therefore, the lesson is that for the test case wind turbine, the generator aging impacts remarkably on the power production in Region 2, while in Region 2 12, the impact of the gearbox aging dominates over the generator aging; for this reason, wind turbine refurbishment or component replacement should be carefully considered on the grounds of the wind intensity distribution onsite.
引用
收藏
页数:21
相关论文
共 50 条
  • [31] Sensitivity analysis of the effect of wind characteristics and turbine properties on wind turbine loads
    Robertson, Amy N.
    Shaler, Kelsey
    Sethuraman, Latha
    Jonkman, Jason
    WIND ENERGY SCIENCE, 2019, 4 (03) : 479 - 513
  • [32] The Use of a Real-Time Simulator for Analysis of Power Grid Operation States with a Wind Turbine
    Klosowski, Zbigniew
    Cieslik, Slawomir
    ENERGIES, 2021, 14 (08)
  • [33] Advanced Methods for Wind Turbine Performance Analysis Based on SCADA Data and CFD Simulations
    Castellani, Francesco
    Pandit, Ravi
    Natili, Francesco
    Belcastro, Francesca
    Astolfi, Davide
    ENERGIES, 2023, 16 (03)
  • [34] Fatigue Reliability Analysis of Wind Turbine Cast Components
    Rafsanjani, Hesam Mirzaei
    Sorensen, John Dalsgaard
    Faester, Soren
    Sturlason, Asger
    ENERGIES, 2017, 10 (04):
  • [35] Discussion of Wind Turbine Performance Based on SCADA Data and Multiple Test Case Analysis
    Astolfi, Davide
    Pandit, Ravi
    Terzi, Ludovico
    Lombardi, Andrea
    ENERGIES, 2022, 15 (15)
  • [36] The research of natural environmental factors on the impact of wind turbine operation
    Wang, Junping
    International Journal of Applied Environmental Sciences, 2013, 8 (15): : 1923 - 1932
  • [37] Considering Uncertainties of Key Performance Indicators in Wind Turbine Operation
    Pfaffel, Sebastian
    Faulstich, Stefan
    Rohrig, Kurt
    APPLIED SCIENCES-BASEL, 2020, 10 (03):
  • [38] Model Predictive Control-enabled Fault Ride Through Operation Strategy for High Power Wind Turbine
    Catalan, Pedro
    Wang, Yanbo
    Chen, Zhe
    Arza, Joseba
    2022 24TH EUROPEAN CONFERENCE ON POWER ELECTRONICS AND APPLICATIONS (EPE'22 ECCE EUROPE), 2022,
  • [39] Wind turbine condition monitoring based on three fitted performance curves
    Zhang, Shuo
    Robinson, Emma
    Basu, Malabika
    WIND ENERGY, 2024, 27 (05) : 429 - 446
  • [40] Analysis of wind turbine grounding systems
    Lorentzou, MI
    Hatziargyriou, ND
    Papadias, BC
    MELECON 2000: INFORMATION TECHNOLOGY AND ELECTROTECHNOLOGY FOR THE MEDITERRANEAN COUNTRIES, VOLS 1-3, PROCEEDINGS, 2000, : 936 - 939