Barriers for BIM (Building Information Modeling) Adoption

被引:0
作者
Nyvlt, Vladimir [1 ]
Vondrackova, Terezie [1 ]
Vostova, Vera [2 ]
机构
[1] Inst Technol & Business, Okruzni 10, Ceske Budejovice 37001, Czech Republic
[2] Czech Tech Univ, Fac Transportat Sci, Prague 11000 1, Czech Republic
来源
CENTRAL EUROPEAN CONFERENCE IN FINANCE AND ECONOMICS (CEFE2015) | 2015年
关键词
Building Information Modelling; BIM Adoption; Culture Changes; Barriers to Implementation; Civil Engineering; PROJECT;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
BIM has a big potential to support all areas in building industry with both information and data in time, and tools needed to handle with data. Contribution in particular activities, spread from design through various building activities to maintenance of completed facilities varies significantly. This variety in approach and adoption of BIM tools creates "barriers" in BIM implementation processes. The chapter tries not to focus on one aspect, but trying to identify and evaluate more aspects contributing to general low acceptance of BIM adoption, and identify where to look for solutions, and where to focus further research.
引用
收藏
页码:486 / 492
页数:7
相关论文
共 34 条
[1]  
[Anonymous], CASE STUDIES EVALUAT
[2]  
[Anonymous], GOVT CONSTR STRAT
[3]  
[Anonymous], P PORTL INT C MAN EN
[4]  
[Anonymous], 2006, BARRIERS INFLUENCE I
[5]  
[Anonymous], WORK PART STRAT PAP
[6]  
[Anonymous], J APPL EC SCI
[7]  
[Anonymous], 2010, P INT C COMP CIV BUI
[8]  
[Anonymous], 2009, COLLABORATION INTEGR
[9]  
[Anonymous], 2011, BIM HDB GUIDE BUILDI, DOI DOI 10.1002/9781119287568
[10]  
[Anonymous], BEN OF BIM