Estimation of discharges of water flows and debris floods in a small watershed

被引:9
|
作者
Guo, Xiaojun [1 ,2 ]
Cui, Peng [1 ,2 ]
Chen, Xingchang [3 ]
Li, Yong [1 ]
Zhang, Ju [3 ]
Sun, Yuqing [3 ]
机构
[1] Chinese Acad Sci, Key Lab Mt Hazards & Surface Proc, Inst Mt Hazards & Environm, Chengdu 610041, Peoples R China
[2] CAS Ctr Excellence Tibetan Plateau Earth Sci, Beijing 100101, Peoples R China
[3] Southwest Univ Sci & Technol, Sch Environm & Resource, Mianyang 621020, Sichuan, Peoples R China
关键词
debris flood; hydrological simulation; peak discharge; rainfall; Wenchuan earthquake; HEC-HMS; MODEL; UNCERTAINTY; RUNOFF; PARAMETERS; TORRENT; CLASSIFICATION; CATCHMENTS; PROVINCE; DESIGN;
D O I
10.1002/esp.5053
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Floods in small mountainous watersheds cover a wide spectrum of flow. They can range from clear water flows and hyperconcentrated flows to debris floods and debris flows, and calculation of the peak discharge is crucial for predicting and mitigating such hazards. To determine the optimal approach for discharge estimation, this study compared water flow monitoring hydrographs to investigate the performance of five hydrological models that incorporate different runoff yields and influx calculation methods. Two of the models performed well in simulating the peak discharge, peak time, and total flow volume of the water flood. The ratio (gamma) of the monitored debris flood discharge (Q(d)) to the simulated water flow discharge (Q(w)) was investigated. Qualitatively, gamma initially increased with Q(w) but then decreased when Q(w) exceeded a certain threshold, which corresponded to rainfall of 95 and 120 mm in a 6- and 24-h event with a normal distribution of precipitation, respectively. The decrease might be attributable to a threshold of sediment availability being reached, beyond which increased flow rate is not matched by increased sediment input in the large watershed. Uncertainty of hydrological calculation was evaluated by dividing the catchment into sub-basins and adopting different rainfall time steps as input. The efficiency of using a distributed simulation exhibited marginal improvement potential compared with a lumped simulation. Conversely, the rainfall time step input significantly affected the simulation results by delaying the peak time and decreasing the peak discharge. This research demonstrates the applicability of a discharge estimation method that combines a hydrological water flow simulation and an estimation of gamma. The results were verified on the basis of monitored flow densities and videos obtained in two watersheds with areas of 2.34 and 32.4 km(2).
引用
收藏
页码:642 / 658
页数:17
相关论文
共 50 条
  • [21] A formation model for debris flows in the Chenyulan River Watershed, Taiwan
    Yu, Bin
    Li, Li
    Wu, Yufu
    Chu, Shengming
    NATURAL HAZARDS, 2013, 68 (02) : 745 - 762
  • [22] Nutrient flows and management of a small watershed
    Valdo Kuusemets
    Ülo Mander
    Landscape Ecology, 2002, 17 : 59 - 68
  • [23] Nutrient flows and management of a small watershed
    Kuusemets, V
    Mander, Ü
    LANDSCAPE ECOLOGY, 2002, 17 (Suppl 1) : 59 - 68
  • [24] Mean velocity estimation of viscous debris flows
    Hongjuan Yang
    Fangqiang Wei
    Kaiheng Hu
    Journal of Earth Science, 2014, 25 : 771 - 778
  • [25] Mean Velocity Estimation of Viscous Debris Flows
    Yang, Hongjuan
    Wei, Fangqiang
    Hu, Kaiheng
    JOURNAL OF EARTH SCIENCE, 2014, 25 (04) : 771 - 778
  • [26] Mean Velocity Estimation of Viscous Debris Flows
    Hongjuan Yang
    Fangqiang Wei
    Kaiheng Hu
    Journal of Earth Science, 2014, 25 (04) : 771 - 778
  • [27] A novel method for measuring the timing of bed erosion during debris flows and floods
    Berger, Catherine
    McArdell, Brian W.
    Fritschi, Bruno
    Schlunegger, Fritz
    WATER RESOURCES RESEARCH, 2010, 46
  • [28] IFKIS-Hydro: an early warning and information system for floods and debris flows
    Romang, Hans
    Zappa, Massimiliano
    Hilker, Nadine
    Gerber, Matthias
    Dufour, Francois
    Frede, Valerie
    Berod, Dominique
    Oplatka, Matthias
    Hegg, Christoph
    Rhyner, Jakob
    NATURAL HAZARDS, 2011, 56 (02) : 509 - 527
  • [29] Remedial works against debris flows after floods in the State of Vargas, Venezuela
    Di Pietro, P.
    Morassutti, G.
    Fracassi, G.
    RIVER BASIN MANAGEMENT IV, 2007, 104 : 127 - 135
  • [30] A novel method for measuring the timing of bed erosion during debris flows and floods
    Swiss Federal Research Institute WSL, Zürcherstr. 111, CH-8903 Birmensdorf, Switzerland
    不详
    Water Resour. Res., 2