Additive manufacturing impacts on a two-level supply chain

被引:13
作者
Ashour Pour, Milad [1 ]
Zanoni, Simone [1 ]
Bacchetti, Andrea [1 ]
Zanardini, Massimo [1 ]
Perona, Marco [1 ]
机构
[1] Univ Brescia, Dept Mech & Ind Engn, Brescia, Italy
关键词
Additive manufacturing; traditional manufacturing; supply chain management; joint economic lot sizing;
D O I
10.1080/23302674.2017.1340985
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Additive Manufacturing (AM) is a recent and rapidly developing technology, which has brought about significant disruptions in the manufacturing arena. To capture the full spectrum of changes resulting from AM's introduction into the industry, it is not sufficient to look at it just as a disruptive set of technologies but, rather, take a system's approach. It must be noted that the investigation of AM's impacts cannot be limited to an individual actor, but should encompass the whole supply chain to fully consider the relevant changes in strategic as well as tactical decision-making and operations. This paper presents an analytic approach based on Joint Economic Lot Sizing model, and aims at capturing the most significant impacts resulting from the implementation of the AM concept on a two-level supply chain. This assessment of AM from inventory and logistics standpoints is targeted at providing insights into how manufacturers could adapt their supply chains' planning to accommodate new paradigms introduced by AM. A numerical example followed by sensitivity analysis of a real industrial case study is presented to provide evidence for the main findings and further generalise them.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 36 条
[1]   A methodological framework for the inclusion of modern additive manufacturing into the production portfolio of a focused factory [J].
Achillas, Ch. ;
Aidonis, D. ;
Iakovou, E. ;
Thymianidis, M. ;
Tzetzis, D. .
JOURNAL OF MANUFACTURING SYSTEMS, 2015, 37 :328-339
[2]   Economics of additive manufacturing for end-usable metal parts [J].
Atzeni, Eleonora ;
Salmi, Alessandro .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (9-12) :1147-1155
[3]   Redesign and cost estimation of rapid manufactured plastic parts [J].
Atzeni, Eleonora ;
Iuliano, Luca ;
Minetola, Paolo ;
Salmi, Alessandro .
RAPID PROTOTYPING JOURNAL, 2010, 16 (05) :308-317
[4]   A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR [J].
BANERJEE, A .
DECISION SCIENCES, 1986, 17 (03) :292-311
[5]  
Costabile G, 2017, INT J IND ENG COMP, V8, P263, DOI 10.5267/j.ijiec.2016.9.001
[6]   Additive manufacturing flickering at the beginning of existence [J].
Cozmei, Catalina ;
Caloian, Florentin .
INTERNATIONAL CONFERENCE EMERGING MARKETS QUERIES IN FINANCE AND BUSINESS, 2012, 3 :457-462
[7]  
Doubrovski Z, 2012, PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2011, VOL 9, P635
[8]   Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost [J].
Ertogral, K. ;
Darwish, M. ;
Ben-Daya, M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) :1592-1606
[9]   A joint economic lot size model with third-party processing [J].
Ferretti, Ivan ;
Mazzoldi, Laura ;
Zanoni, Simone ;
Zavanella, Lucio Enrico .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 106 :222-235
[10]   The status, challenges, and future of additive manufacturing in engineering [J].
Gao, Wei ;
Zhang, Yunbo ;
Ramanujan, Devarajan ;
Ramani, Karthik ;
Chen, Yong ;
Williams, Christopher B. ;
Wang, Charlie C. L. ;
Shin, Yung C. ;
Zhang, Song ;
Zavattieri, Pablo D. .
COMPUTER-AIDED DESIGN, 2015, 69 :65-89