Energy-consumption and economic analysis of group and building substation systems - A case study of the reformation of the district heating system in China

被引:10
作者
Wang, Peng [1 ]
Sipila, Kari [2 ]
机构
[1] Harbin Inst Technol, Sch Municipal & Environm Engn, Harbin 150090, Peoples R China
[2] Tech Res Ctr Finland, Smart Energy & Syst Integrat, FI-02150 Espoo, Finland
关键词
District heating; Substation; Energy consumption; Economic analysis; Building simulation; SIMULATION;
D O I
10.1016/j.renene.2015.08.070
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Group substations have dominated district heating (DH) systems in China so far. In order to explore the applicability of building substations to DH systems in China, the case study has been carried out in Ulanhot, by comprehensively comparing the energy consumptions and costs of group and building substation systems. Firstly, building simulation is used to help design the substations and DH networks, and analyze the operation considering variable flow and holiday control, which revealed the energy-saving advantages and flexibility of the building substation system. Secondly, the structure of the outdoor network in the building substation system is redesigned using the results of building simulation. Then, the total energy consumption of the group and building substation systems, including heating energy, pumping energy, and heat loss, is simulated and compared, considering the regulation of the water temperature. According to the operation data of the group substation system in the last two heating periods, the relative error of the simulated total energy was 6.8%. Finally, the annual cost method is employed for the economic analysis, which shows the superiority of the building substation system with annual cost reductions ranging between 5.7 and 5.9% for a lifetime range of 10-30 years. (C) 2015 Published by Elsevier Ltd.
引用
收藏
页码:1139 / 1147
页数:9
相关论文
共 29 条
[1]  
[Anonymous], 1999, COST RED OP DH NETW
[2]  
[Anonymous], 2009, ASHRAE FUNDAMENTALS
[3]  
[Anonymous], 2011, GUID DISTR HEAT SUBS
[4]  
Beijing Gas and Heating Engineering Design Institute, 2010, CJJ 34 2010 DES COD
[5]   OPERATIONAL OPTIMIZATION IN A DISTRICT-HEATING SYSTEM [J].
BENONYSSON, A ;
BOHM, B ;
RAVN, HF .
ENERGY CONVERSION AND MANAGEMENT, 1995, 36 (05) :297-314
[6]   Single, twin and triple buried heating pipes: on potential savings in heat losses and costs [J].
Bohm, B ;
Kristjansson, H .
INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2005, 29 (14) :1301-1312
[7]  
Crowe C.T., 2005, ENG FLUID MECH, V8th
[8]  
Eliseev K., 2011, THESIS
[9]  
Euroheat Power, 2011, DISTR HEAT BUILD
[10]  
Fraser N., 2006, ENG EC CANADA, VThird