A metaheuristic scheduling procedure for resource-constrained projects with cash flows

被引:0
|
作者
Zhu, D
Padman, R [1 ]
机构
[1] Carnegie Mellon Univ, H John Heinz III Sch Publ Policy & Management, Pittsburgh, PA 15213 USA
[2] Iowa State Univ, Coll Business Adm, Ames, IA 50011 USA
关键词
tabu search; constrained project scheduling; heuristics;
D O I
10.1002/(SICI)1520-6750(199912)46:8<912::AID-NAV3>3.0.CO;2-C
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under differing project conditions can lead to a suboptimal choice of an appropriate heuristic for scheduling any given project. This may result in poor schedules and monetary losses. This paper reports on the application of the tabu search metaheuristic procedure for the RCPSPCE Strategies for neighborhood generation and candidate selection that exploit the special features of the problem are combined with a simple multiheuristic start procedure. Extensive experimentation, with multiple data sets and comparison with an upper bound, indicates a significant improvement, both in project Net Present Value (NPV) as well as the number of projects, where the metaheuristic outperforms the best known heuristics in the literature. More specifically, this procedure produces the best schedules in over 85% of the projects tested, in contrast to the best single-pass heuristics which have been shown to dominate in at most 20% of the same cases. This iterative, general purpose heuristic is able to adapt significantly better to the complex interactions of the many critical parameters of the RCPSPCF than single-pass heuristics that use more specific information about each project environment. (C) 1999 John Wiley & Sons, Inc.
引用
收藏
页码:912 / 927
页数:16
相关论文
共 50 条