Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation

被引:12
作者
Yuan, Zhenmin [1 ,2 ]
Qiao, Yaning [1 ,2 ]
Guo, Yaru [1 ]
Wang, Yaowu [3 ]
Chen, Chen [4 ]
Wang, Wenshun [1 ,2 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, Xuzhou 221116, Jiangsu, Peoples R China
[2] China Univ Min & Technol, Res Ctr Digitalized Construct & Knowledge Engn, Xuzhou 221116, Jiangsu, Peoples R China
[3] Harbin Inst Technol, Sch Civil Engn, Harbin 150001, Peoples R China
[4] Nantong Prefabricated Bldg & Intelligent Struct I, Nantong 226000, Peoples R China
基金
中国国家自然科学基金;
关键词
MULTIPLE PRODUCTION; CONTROL-SYSTEM; CONSTRUCTION; DESIGN; IMPROVEMENT; COMPLEXITY; PRINCIPLES; MANAGEMENT; ALLOCATION; BUILDINGS;
D O I
10.1155/2020/8814914
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Component factories are experiencing the problems associated with lean production, especially the accuracy of production time prediction and the unnecessary waste in terms of time and resource utilization. In order to solve these problems, a discrete event simulation- (DES-) based lean planning and optimization method for precast component production is proposed by integrating the complexity assessment (CS), discrete event simulation (DES), and lean management (LM). The method includes three submodels: improved production planning, DES, and lean analysis and optimization. In the submodel of improved production planning, a complexity evaluation index system for precast components is established through investigating five component factories, consulting seven domain experts and analysing relevant literature. In the submodel of DES, the DES technique is adopted to simulate and analyse the production activities of precast components. The submodel of lean analysis and optimization provides multidimensional analysis, comparative analysis, and suggestions. Finally, a detailed production case is selected to simulate and test the proposed method. The important findings are as follows: (1) this method can minimize the difference between the processing time of each workstation to avoid bottleneck stations as much as possible; (2) this method can capture the uncertainty during precast component production, and the most likely production time calculated by the method is 12.05 hours instead of the 11.50 hours originally estimated by the component factory; (3) this method can identify some unnecessary waste in the production process of precast components, including less than 50% utilization of workstations and unnecessary equipment purchases; (4) this method also provides some suggestions regarding production optimization. Due to the particularity of precast component production, it further expands the boundary of lean production methodology from the perspective of the construction industry rather than the manufacturing industry. The proposed method assists component factories in planning and optimizing the precast component production when they make detailed production plans.
引用
收藏
页数:14
相关论文
共 63 条
  • [1] Role of Simulation in Construction Engineering and Management
    AbouRizk, Simaan
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (10) : 1140 - 1153
  • [2] Developing Crew Allocation System for the Precast Industry Using Genetic Algorithms
    Al-Bazi, Ammar
    Dawood, Nashwan
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2010, 25 (08) : 581 - 595
  • [3] Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID
    Altaf, Mohammed Sadiq
    Bouferguene, Ahmed
    Liu, Hexu
    Al-Hussein, Mohamed
    Yu, Haitao
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 85 : 369 - 383
  • [4] [Anonymous], 1992, APPL NEW PRODUCTION
  • [5] Antani K. R., 2014, ALL DISSERTATIONS, V14
  • [6] Optimization modeling modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction
    Arashpour, Mehrdad
    Kamat, Vineet
    Bai, Yu
    Wakefield, Ron
    Abbasi, Babak
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 95 : 1 - 9
  • [7] Optimization of process integration and multi-skilled resource utilization in off-site construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Minas, James
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 50 : 72 - 80
  • [8] Intelligence approach to production planning system for bespoke precast concrete products
    Benjaoran, Vacharapoom
    Dawood, Nashwan
    [J]. AUTOMATION IN CONSTRUCTION, 2006, 15 (06) : 737 - 745
  • [9] The role of formal and informal mechanisms in implementing lean principles in construction projects
    Bygballe, Lena Elisabeth
    Endresen, Maria
    Falun, Silje
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (10) : 1322 - 1338
  • [10] Chang C., 2016, J SHENYANG JIANZHU U, V18, P470, DOI [10.11717/j.issn.1673-1387.2016.05.07, DOI 10.11717/J.ISSN.1673-1387.2016.05.07]