CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction

被引:48
作者
Dolabi, Hamid Reza Zolfaghar [1 ]
Afshar, Abbas [1 ]
Abbasnia, Reza [1 ]
机构
[1] Iran Univ Sci & Technol, Sch Civil Engn, Tehran, Iran
关键词
Heuristics; Algorithms; Optimization; Project scheduling; Line of balance; Repetitive projects; CONSTRUCTION PROJECTS; MODEL; BALANCE; LINE; MATTILA; KRIS; G; OPTIMIZATION; PARK; AMY; CPM;
D O I
10.1016/j.autcon.2014.09.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a methodology to improve CPM/LOB scheduling method for deadline constraint satisfaction. A complete and simple heuristic approach called "heuristic line of balance" (HLOB) is introduced for scheduling projects with serial activities. It employs four heuristic rules and their appropriate combination in addition to seeking CPM/LOB initial calculation. As an improvement to the HLOB algorithm, the "search-based heuristic line of balance" (SHLOB) algorithm is also presented, which is more efficient as projects grow in size. Finally, a complete mathematical version of the LOB model in the form of mixed integer nonlinear programming (MINLP) is applied for verification of the proposed models. Two simple case studies and a hypothetical large-scale highway project are used to test the performance of the improved models. Due to the results of this paper, HLOB and SHLOB are able to present optimum/near optimum solutions in a much more economical way that may justify their widespread use. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:107 / 118
页数:12
相关论文
共 31 条
[1]   Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities [J].
Ali, Mohammed Mubashir ;
Elazouni, Ashraf .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (09) :839-856
[2]   FORMAL DEVELOPMENT OF LINE-OF-BALANCE TECHNIQUE [J].
ALSARRAJ, ZM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :689-704
[3]   LOB and CPM Integrated Method for Scheduling Repetitive Projects [J].
Ammar, Mohammad A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :44-50
[4]  
[Anonymous], LINGO USERS GUIDE
[5]   Challenges in line-of-balance scheduling [J].
Arditi, D ;
Tokdemir, OB ;
Suh, K .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (06) :545-556
[6]   LINE-OF-BALANCE SCHEDULING IN PAVEMENT CONSTRUCTION [J].
ARDITI, D ;
ALBULAK, MZ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1986, 112 (03) :411-424
[7]  
Arditi D., 2001, Engineering, Construction and Architectural Management, V8, P90, DOI 10.1108/eb021173
[8]  
Arditi D., 2002, Construction Management and Economics, V20, P353, DOI DOI 10.1080/01446190210131647
[9]  
Cho K., 2010, Can. J. Civil Eng, V38, P36
[10]   Resource Leveling in Line-of-Balance Scheduling [J].
Damci, Atilla ;
Arditi, David ;
Polat, Gul .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2013, 28 (09) :679-692